Firmansyah, Angga (2014) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PEMBANGUNAN PROYEK KONSTRUKSI GEDUNG DI WILAYAH BSD SERPONG. STUDI KASUS PADA PROYEK KONSTRUKSI GEDUNG ANDALAN HEADQUARTER AND SHOWROOM BSD - SERPONG, TANGERANG. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (64kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (307kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (109kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (268kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (605kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (677kB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (144kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (538kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 14 016 |
NIM/NIDN Creators: | 41110010048 |
Uncontrolled Keywords: | ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PEMBANGUNAN PROYEK KONSTRUKSI GEDUNG DI WILAY |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 02 Sep 2014 11:37 |
Last Modified: | 12 May 2017 02:10 |
URI: | http://repository.mercubuana.ac.id/id/eprint/12931 |
Actions (login required)
View Item |