SAPUTRA, TIO (2026) KAJIAN PENJADWALAN PEMBANGUNAN PERUMAHAN SADYAGRIA PODOMORO BERBASIS PRECEDENCE DIAGRAM METHOD (PDM) MENGGUNAKAN MICROSOFT PROJECT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
Cover.pdf Download (2MB) | Preview |
|
|
Text (BAB I)
Bab 1.pdf Restricted to Registered users only Download (2MB) |
||
|
Text (BAB II)
Bab 2.pdf Restricted to Registered users only Download (7MB) |
||
|
Text (BAB III)
Bab 3.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB IV)
Bab 4.pdf Restricted to Registered users only Download (11MB) |
||
|
Text (BAB V)
Bab 5.pdf Restricted to Registered users only Download (620kB) |
||
|
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Restricted to Registered users only Download (681kB) |
||
|
Text (LAMPIRAN)
Lampiran.pdf Restricted to Registered users only Download (12MB) |
Abstract
KAJIAN PENJADWALAN PEMBANGUNAN PERUMAHAN SADYAGRIA PODOMORO BERBASIS PRECEDENCE DIAGRAM METHOD (PDM) MENGGUNAKAN MICROSOFT PROJECT
| Item Type: | Thesis (S1) |
|---|---|
| NIM/NIDN Creators: | 41124110093 |
| Uncontrolled Keywords: | Perjadwalan Proyek, Precedence Diagram Method (PDM), Lintasan Kritis, Microsoft Project |
| Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.9 Construction Management/Manajemen Konstruksi |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | khalimah |
| Date Deposited: | 27 Feb 2026 06:52 |
| Last Modified: | 27 Feb 2026 06:52 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/101229 |
Actions (login required)
![]() |
View Item |
