Up a level |
ABADI, DANA MULYA (2016) SISTEM FIRE PROTECTION DALAM MENDETEKSI KEBAKARAN PADA GEDUNG EQUITY TOWER. S1 thesis, Universitas Mercu Buana Jakarta.
ABDURAHMAN, FUAD (2024) PERANCANGAN SISTEM KENDALI VENTILASI UDARA BERBASIS MIKROKONTROLER MENGGUNAKAN METODE FUZZY LOGIC MAMDANI PADA BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.
AKSYAR, FAWZI (2024) RANCANG BANGUN PROTOTIPE KONTROL VENTILATING AND AIR CONDITIONING DI RUANGAN BLOWER SISTEM PNEUMATIC TUBE MENGGUNAKAN INTERNET OF THINGS. S1 thesis, Universitas Mercu Buana Jakarta.
AMRIZAL, MUHAMMAD NAUFAL (2022) ANALISIS PERBANDINGAN BIAYA DAN MUTU PANEL BETON CAMPURAN FLY ASH DAN BOTTOM ASH DENGAN PANEL BETON KONVENSIONAL (Studi Kasus Panel Beton Precast pada Proyek Pemagaran Coal Yard PLTU Suralaya Banten). S1 thesis, Universitas Mercu Buana Jakarta.
ANNINDITA, INNES MUTHIAH (2023) ANALISIS KEBUTUHAN BEBAN PENDINGIN DAN KONDISI UDARA IDEAL PADA RUANG ISOLASI DI RUMAH SAKIT “X” DENGAN METODE CLTD (COOLING LOAD TEMPERATURE DIFFERENCE). S1 thesis, Universitas Mercu Buana Jakarta.
EDI, MARSKAL (2017) ANALISIS KINERJA ALAT PENUKAR KALOR SEBAGAI PENDINGIN FLUIDA PADA PROSES ROLLING MILL. S1 thesis, Universitas Mercu Buana Jakarta.
FARIZIE, SYAHRUL ADITIA AL (2022) RANCANG BANGUN MONITORING SUHU UDARA DAN KELEMBAPAN TANAH SERTA PENYIRAM TANAMAN ANGGREK OTOMATIS BERBASIS ESP32 DENGAN METODE WIRELESS SENSOR NETWORK. S1 thesis, Universitas Mercu Buana Jakarta.
FATHURAHMAN, MUHAMMAD (2024) ANALISIS BEBAN PENDINGINAN: STUDI KASUS PADA RUANG GYM DI GANDARIA HEIGHTS APARTMENT DENGAN COOLING LOAD TEMPERATURE DIFFERENCE DAN TRANSFER FUNCTION METHOD. S1 thesis, Universitas Mercu Buana Jakarta.
FAUZI, AJIE RIZKY (2018) ANALISIS PEMILIHAN MATERIAL DAN KETEBALAN ISOLASI PIPA AIR PENDINGIN CHILLER SERTA PENGARUHNYA TERHADAP BIAYA PROYEK GREEN OFFICE PARK 1. S1 thesis, Universitas Mercu Buana Jakarta.
HIDAYATULLAH, WAHID (2024) SIMULASI SISTEM KONTROL AC-AC KONVERTER BERBASIS PID MENGGUNAKAN PERANGKAT LUNAK MATLAB SIMULINK. S1 thesis, Universitas Mercu Buana Jakarta.
IQBAL, MUHAMMAD (2024) PROTOTYPE MONITORING DAN KONTROL SUHU SERTA KELEMBAPAN UDARA PADA RUANGAN PENYIMPANAN BATERAI DI GARDU INDUK PLN CIKANDE MENGGUNAKAN METODE FUZZY MAMDANI. S1 thesis, Universitas Mercu Buana Jakarta.
JAYA, SUPARDI KUSUMA (2018) SISTEM KONTROL PEMANAS PADA MESIN EXTRUDER DI PT. DUNIA PLASTECH. S1 thesis, Universitas Mercu Buana Jakarta.
KUSTANTO, DIO ARRAZY (2018) PERANCANGAN WATER HEATER TERINTEGRASI DENGAN AC SENTRAL PADA GEDUN JIEXPO CONVENTION & THEATRE. S1 thesis, Universitas Mercu Buana Jakarta.
KUSUMA, MUHAMMAD RADEN (2024) ANALISIS EVALUASI BEBAN PENDINGIN RUANG KAMAR TIDUR PADA RUMAH TYPE 36. S1 thesis, Universitas Mercu Buana Jakarta.
MAF'ULATUZZAHROH, MAF'ULATUZZAHROH (2019) PERANCANGAN DESAIN INTERIOR GREENHOUSE CO-WORKING SPACE DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.
MUCHLIS, MUHAMAD (2014) LAPORAN KERJA PRAKTEK ANALISIS SISTEM PENDINGIN RUANG BATERAI (DC COOLER ) DI PT. BERATHI. S1 thesis, Universitas Mercu Buana Jakarta.
NOPRIANSYAH, AMDI (2024) PERANCANGAN DASHBOARD MONITORING BEARING HEATER MENGGUNAKAN APLIKASI NODE-RED. S1 thesis, Universitas Mercu Buana Jakarta.
NUGRAHA, ADIKRISNA (2019) SISTEM KERJA DAMPER PADA HEAT RECOVERY STEAM GENERATOR (HRSG) PLTGU BLOK 2 TAMBAK LOROK SEMARANG PT. INDONESIA POWER UP SEMARANG. S1 thesis, Universitas Mercu Buana Jakarta.
NUGRAHA, PRIBADI (2024) RANCANG BANGUN SISTEM KONTROL DAN MONITORING SISTEM PENDINGINAN DAN PENERANGAN PADA GEDUNG PERKANTORAN BERBASIS PLC VIRTUAL MACHINE EXPERION LXR120. S1 thesis, Universitas Mercu Buana Jakarta.
PRATAMA, RIZKIA (2024) RANCANG BANGUN AC - AC CONVERTER SATU FASA BERBEBAN TRANSFORMATOR PEMANAS BEARING DI GMF POWER SERVICES BERBASIS MIKROKONTROLER STM32F746G - DISCOVERY. S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, YUNATA MANDALA (2024) OPTIMASI PARAMETER PEMESINAN DAN MEDIA PENDINGIN TERHADAP KEKASARAN PERMUKAAN DAN UMUR PAHAT ALUMUNIUM ALLOY 6063 PADA CNC TURNING BERBASIS METODE TAGUCHI. S2 thesis, Universitas Mercu Buana Jakarta.
RODIYANSYAH, ARI (2014) Analisa Modifikasi Sistem Pendingin Air Laut Menjadi Air Tawar Mesin Caterpillar CAT 32 ACERT. S1 thesis, Universitas Mercu Buana Jakarta.
RUMBAMAN, WULAN NURSYIFA (2024) RANCANG BANGUN SISTEM KONTROL DAN MONITORING AIR CONDITIONER MENGGUNAKAN METODE FUZZY MAMDANI BERBASIS IoT PADA GEDUNG GRAHA MERAH PUTIH BUAHBATU. S1 thesis, Universitas Mercu Buana Jakarta.
SEPTIANTO, TRIYONO A (2017) SYSTEM PENDINGIN CHILLER PT INDO TIRTA ABADI. S1 thesis, Universitas Mercu Buana Jakarta.
SOFIAN, FRANS JULI SANTOSA (2018) SIMULASI LAJU ALIRAN DAN KCEPATAN ALIRAN UDARA PENGERING DI DALAM RUANG PENGERING SEMPROT. S1 thesis, Universitas Mercu Buana Jakarta.
SUPIYAT, AGUS (2024) ANALISIS PENGARUH KARBONASI BETON TERHADAP PREDIKSI MASA PAKAI MENARA PENDINGIN DENGAN METODE SIMULASI MONTE CARLO (Studi Kasus Bangunan Menara Pendingin Pltp Gunung Salak Sukabumi). S2 thesis, Universitas Mercu Buana Jakarta.
SYAHLAN, MUHAMAD FAUZAN IBNU (2024) SVR-WOA UNTUK PREDIKSI POLA FLUKTUASI KONSENTRASI METHANA MENGGUNAKAN CITRA INSTRUMEN TROPOMI SENTINEL-5P OFFLINE DALAM UPAYA MENGURANGI DAMPAK PEMANASAN GLOBAL. S1 thesis, Universitas Mercu Buana Jakarta.
Singgih, Dhono (2013) Perawatan Dan Analisa Gangguan Yang Terjadi Pada Primary Air Heater Boiler Unit 7 PLTU Suralaya. S1 thesis, Universitas Mercu Buana.
TAMPUBOLON, CANDRA HATTA (2018) ANALISIS PENDINGINAN SECTION 1 DEDUSTING SYSTEM SLAB STEEL PLANT PT KRAKATAU STEEL (Persero). Tbk. S1 thesis, Universitas Mercu Buana Jakarta.
WIBOWO, FRANS ANDREAS CHANDRA (2014) ANALISA PERFORMA SISTEM CHILLER BERPENDINGIN UDARA ( AIR COOLED CHILLER ). S1 thesis, Universitas Mercu Buana Jakarta.
ZAGITA, M. FIRDOS AFRIS BONA (2020) RANCANG BANGUN SISTEM PEMANTAUAN DAN PENGENDALI KUALITAS UDARA DIRUANG MI (MANUAL INSERT) PT. SMART METER. S1 thesis, Universitas Mercu Buana Jakarta.