RENDRA, ALDERA AJI MAHA (2023) EVALUASI EFEKTIVITAS KINERJA SEWAGE TREATMENT PLANT PADA GEDUNG GKM GREEN TOWER. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Hal Cover.pdf Download (331kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (81kB) | Preview |
|
Text (BAB I)
3. BAB I.pdf Restricted to Registered users only Download (76kB) |
||
Text (BAB II)
4. BAB II.pdf Restricted to Registered users only Download (331kB) |
||
Text (BAB III)
5. BAB III.pdf Restricted to Registered users only Download (37kB) |
||
Text (BAB IV)
6. BAB IV.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
7. BAB V.pdf Restricted to Registered users only Download (23kB) |
||
Text (DAFTAR PUSTAKA)
8. Daftar Pustaka.pdf Restricted to Registered users only Download (135kB) |
||
Text (LAMPIRAN)
9. Lampiran.pdf Restricted to Registered users only Download (147kB) |
Abstract
Waste water or waste water is the remaining water that is disposed of originating from households, industries, offices, and other public places. Sewage Treatment Plant (STP) is a process of reuse of wastewater, a process to remove contaminants from wastewater. This study evaluates the Sewage Treatment Plant system in the GKM Green Tower Building. The purpose of this study is to analyze the performance of the Sewage Treatment Plant (STP) in the GKM Green Tower building and to determine the effectiveness of the performance of the Sewage Treatment Plant (STP) in the GKM Green Tower building. The parameters used in this study were pH (acidity), COD, BOD, TSS, oil and grease, Total Coliform, Ammonia which complies with Domestic Wastewater Quality Standards Based on the Regulation of the Minister of Environment and Forestry of the Republic of Indonesia Number: P.68/ Menlhk-Setjen/2016. Recycle water in the GKM Green Tower building is used for flushing closed, urinal, and is also used to water plants in the building. It was found that the results of clean wastewater management in the GKM Green Tower building still look cloudy and smelly. Based on the results of domestic wastewater monitoring tests at GKM Green Tower in August / prior to analysis, there were several parameters that exceeded the quality standards, namely TSS and Total Coliform. The Maintenance carried out so far on the Sewage Treatment Plant (STP) system in the GKM Green Tower Building is still not good, so this is the cause of the ineffectiveness of the wastewater that has been managed so far. The results of the second test conducted in November showed a decrease in the number among the TSS parameters, namely as many as 13, so that it became 23. In addition, the Total Coliform was 38,000, so that the Total coliform became 3,000. So that it is in accordance with the quality standards set government ministry of environment. Keywords: Wastewater, Sewage Treatment Plant (STP), GKM Green Tower Building, Domestic wastewater quality standard
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/MSN. 23 011 |
Call Number: | ST/13/23/021 |
NIM/NIDN Creators: | 41318110054 |
Uncontrolled Keywords: | Wastewater, Sewage Treatment Plant (STP), GKM Green Tower Building, Domestic wastewater quality standard |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin |
Divisions: | Fakultas Teknik > Teknik Mesin |
Depositing User: | ADELINA HASNA SETIAWATI |
Date Deposited: | 31 Mar 2023 03:00 |
Last Modified: | 31 Mar 2023 03:00 |
URI: | http://repository.mercubuana.ac.id/id/eprint/75744 |
Actions (login required)
View Item |