ZARAWI, M IQBAL (2019) ANALISIS KOORDINASI SETTING RELAY PROTEKSI OCR, GFR DAN RECLOSER SETELAH PENAMBAHAN FEEDER PADA JARINGAN DISTRIBUSI 20 KV. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 HALAMAN JUDUL.pdf Download (110kB) | Preview |
|
|
Text (ABSTRAK)
02 ABSTRAK__.pdf Download (49kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
03 lembar pernyataan.pdf Download (108kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
04 lembar pengesahan.pdf Download (100kB) | Preview |
|
|
Text (KATA PENGANTAR)
05 HALAMAN KATA PENGANTAR.pdf Download (122kB) | Preview |
|
|
Text (DAFTAR ISI)
06 DAFTAR ISI.pdf Download (101kB) | Preview |
|
|
Text (DAFTAR TABEL)
07 DAFTAR TABEL.pdf Download (30kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
08 DAFTAR GAMBAR.pdf Download (96kB) | Preview |
|
|
Text (DAFTAR ISTILAH)
09 DAFTAR ISTILAH.pdf Download (24kB) | Preview |
|
Text (BAB I)
10 TA-Bab I.pdf Restricted to Registered users only Download (35kB) |
||
Text (BAB II)
12 TA-Bab III.pdf Restricted to Registered users only Download (577kB) |
||
Text (BAB III)
11 TA-Bab II.pdf Restricted to Registered users only Download (640kB) |
||
Text (BAB IV)
13 TA-Bab IV.pdf Restricted to Registered users only Download (880kB) |
||
Text (BAB V)
14 TA-Bab V.pdf Restricted to Registered users only Download (31kB) |
||
Text (DAFTAR PUSTAKA)
15 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (69kB) |
||
Text (LAMPIRAN)
16 Lampiran.pdf Restricted to Registered users only Download (1MB) |
Abstract
The Distribution system is part of electrical power system that serves to deliver electricity from 150/20 kV Substation to consumers. Pudakpayung 60 MVA Substation has 5 feeders, in 2016 there is a new feeder with code PDP 5. One form of fault in the power distribution system is short circuit. To overcome the short circuit in the distribution system require a reliable protection system. Relay setting and relay coordination is one of the requirements of protection system reliability. This final project evaluating the relay setting and relay coordination of OCR, GFR and Recloser Pudakpayung Substation feeder after the addition of feeder PDP 5. The evaluation results using ETAP 12.6.0 shows the condition of the existing coordination between the relay protection equipment at feeder PDP when there is a maximum current fault with incoming relay TMS value OCR = 0,3 and GFR = 0,43 also outgoing relay TMS value OCR = 0,27 and GFR = 0,41. The existing protection coordination is not in accordance with the IEEE 242-1986 standard by the grading time 0.3-0.4 seconds and there is no coordination curves precede and overlap. After the relay coordination adjusted by changing the Iset and TMS of the relay so the incoming relay TMS value OCR = 0,423 and GFR = 0,545; outgoing relay PDP 2 TMS value OCR = 0,389 and GFR = 0,448; and outgoing relay PDP 1,3,4,5,6 OCR = 0,34 and GFR = 0,415. Keywords: Distribution System, short circuit fault, relay, recloser Sistem distribusi merupakan bagian dari sistem tenaga listrik yang berfungsi untuk menyalurkan tenaga listrik dari Gardu Induk 150/20 kV ke konsumen. GIS Pudakpayung 60 MVA mempunyai 5 penyulang, pada tahun 2016 dilakukan penambahan penyulang yaitu penyulang PDP 5. Salah satu bentuk gangguan yang terjadi pada sistem distribusi tenaga listrik adalah gangguan hubung singkat. Untuk mengatasi gangguan hubung singkat pada sistem distribusi maka diperlukan sistem proteksi yang handal. Setting relay dan koordinasi relay adalah salah satu syarat keandalan sistem proteksi. Pada tugas akhir ini dilakukan evaluasi setting proteksi OCR, GFR dan recloser penyulang GIS Pudakpayung setelah adanya penambahan penyulang PDP 5. Hasil evaluasi dengan menggunakan program ETAP 12.6.0 menunjukkan kondisi eksisting koordinasi relay antar peralatan proteksi pada penyulang PDP ketika terjadi gangguan pada arus gangguan maksimal dengan nilai TMS relay Incoming OCR = 0,3 dan GFR = 0,43 serta nilai TMS relay outgoing OCR = 0,27 dan GFR = 0,41. Koordinasi proteksi kondisi eksisting belum sesuai dengan standar IEEE 242-1986 dimana grading time antar peralatan proteksi adalah 0,3-0,4 detik dan tidak ada kurva koordinasi yang saling memotong dan mendahului. Setelah dilakukan perbaikan koordinasi relay dengan mengubah Iset dan TMS relay sehingga nilai TMS relay incoming OCR = 0,423 dan GFR = 0,545; nilai TMS relay outgoing PDP 2 OCR = 0,389 dan GFR = 0,448; dan nilai TMS relay outgoing PDP 1,3,4,5,6 = OCR = 0,34,dan GFR = 0,415 . Kata kunci : Sistem Distribusi, Gangguan Hubung Singkat, Relay, Recloser