ROSALINO, YUDI (2015) Analisa Penjadwalan Proyek Menggunakan Metode CPM dan PERT pada Pembuatan Jembatan Penghubung (Studi Kasus Hotel Harris Summarecon Bekasi). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Hal Cover (Isi File).pdf Download (283kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak (Isi file Abstrak).pdf Download (136kB) | Preview |
|
Text (BAB I)
3. Bab 1 (Isi file bab 1).pdf Restricted to Registered users only Download (111kB) |
||
Text (BAB II)
4. Bab 2 (Isi file bab 2).pdf Restricted to Registered users only Download (257kB) |
||
Text (BAB III)
5. Bab 3 (Isi file bab 3).pdf Restricted to Registered users only Download (142kB) |
||
Text (BAB IV)
6. Bab 4 (Isi file bab 4).pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
7. Bab 5 (Isi file bab 5).pdf Restricted to Registered users only Download (218kB) |
||
Text (BAB VI)
8. Bab 6 (Isi file bab 6).pdf Restricted to Registered users only Download (97kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
9. Hal Daftar Pustaka _ lAMPIRAN.pdf Restricted to Registered users only Download (146kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/ IND. 15 007 |
NIM/NIDN Creators: | 41611110099 |
Uncontrolled Keywords: | Penjadwalan, Analisis Jaringan Kerja |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 05 Jul 2015 15:47 |
Last Modified: | 05 Jul 2022 07:43 |
URI: | http://repository.mercubuana.ac.id/id/eprint/7068 |
Actions (login required)
View Item |