Kasroniyanto, Muhamad (2015) Analisis Perbaikan Penjadwalan Proyek Konstruksi Satu Unit Cluster Aristoteles Dua Lantai Dengan Critical Path Methode (CPM) Pada Proyek CV. Putri Tunggal. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Hal Cover.pdf Download (745kB) | Preview |
|
|
Text (ABSTRAK)
ABSTRAK.pdf Download (123kB) | Preview |
|
Text (BAB I)
BAB I PENDAHULUAN.pdf Restricted to Registered users only Download (238kB) |
||
Text (BAB II)
BAB II TINJAUAN PUSTAKA.pdf Restricted to Registered users only Download (321kB) |
||
Text (BAB III)
BAB III METODOLOGI PENELITIAN.pdf Restricted to Registered users only Download (126kB) |
||
Text (BAB IV)
BAB IV PENGUMPULAN DAN PENGOLAHAN DATA.pdf Restricted to Registered users only Download (588kB) |
||
Text (BAB V)
BAB V ANALISA.pdf Restricted to Registered users only Download (178kB) |
||
Text (BAB VI)
BAB VI KESIMPULAN DAN SARAN.pdf Restricted to Registered users only Download (117kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (101kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 15 026 |
NIM/NIDN Creators: | 41610010009 |
Uncontrolled Keywords: | Critical Path Methode (CPM), Manajemen Proyek, Network Diagram, Float, Crash Program, Cost slope. |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 01 Mar 2015 14:24 |
Last Modified: | 04 Jul 2022 04:32 |
URI: | http://repository.mercubuana.ac.id/id/eprint/7012 |