Analisa Perbandingan Waktu Penjadwalan Proyek Dengan Metode CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique) (Studi Kasus : Perumahan Marigold Ciputra Botanical Pangkal Pinang)

BANGUN, VIRGINA HERAPIKA (2016) Analisa Perbandingan Waktu Penjadwalan Proyek Dengan Metode CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique) (Studi Kasus : Perumahan Marigold Ciputra Botanical Pangkal Pinang). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (Abstrak)
Abstrak.pdf

Download (250kB) | Preview
[img]
Preview
Text (Cover)
Cover.pdf

Download (505kB) | Preview
[img] Text (Bab 1)
Bab 1.pdf
Restricted to Registered users only

Download (161kB)
[img] Text (Bab 2)
Bab 2.pdf
Restricted to Registered users only

Download (274kB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Registered users only

Download (115kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Registered users only

Download (620kB)
[img] Text (Bab 5)
Bab 5.pdf
Restricted to Registered users only

Download (194kB)
[img] Text (Bab 6)
Bab 6.pdf
Restricted to Registered users only

Download (145kB)
[img] Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (592kB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 16 059
NIM/NIDN Creators: 41614120089
Uncontrolled Keywords: Scheduling, Critical Path Methode, Project Evaluation Review Technic, Delay Project
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 09 Sep 2016 14:28
Last Modified: 28 Apr 2017 02:33
URI: http://repository.mercubuana.ac.id/id/eprint/6652

Actions (login required)

View Item View Item