PERANCANGAN PENYEIMBANGAN LINI PERAKITAN MEDIUM SIZE DENGAN MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT DAN COMSOAL UNTUK MENINGKATKAN KAPASITAS PRODUKSI DI PT. KOMATSU INDONESIA

NUGRAHA, ARIF SURYA (2015) PERANCANGAN PENYEIMBANGAN LINI PERAKITAN MEDIUM SIZE DENGAN MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT DAN COMSOAL UNTUK MENINGKATKAN KAPASITAS PRODUKSI DI PT. KOMATSU INDONESIA. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
1. HALAMAN COVER.pdf

Download (182kB) | Preview
[img]
Preview
Text
2. ABSTRAK.pdf

Download (52kB) | Preview
[img] Text
3. BAB I.pdf
Restricted to Registered users only

Download (126kB)
[img] Text
4. BAB II.pdf
Restricted to Registered users only

Download (146kB)
[img] Text
5. BAB III.pdf
Restricted to Registered users only

Download (285kB)
[img] Text
6. BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
7. BAB V.pdf
Restricted to Registered users only

Download (187kB)
[img] Text
8. BAB VI.pdf
Restricted to Registered users only

Download (47kB)
[img] Text
9. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (45kB)

Abstract

PT. Komatsu Indonesia merupakan perusahaan manufaktur yang memproduksi berbagai alat berat dan komponen yang terkait dengan menggunakan system produksi make to order. Pada tahun 2014, Perusahaan menghadapi permasalahan padapeningkatan permintaan produksi dilini perakitan Medium Size. Di lini tersebut pembagian beban kerja pada masing-masing stasiun kerja hanya mampu memproduksi 195 unit/bulan (data bulan Agustus 2014).Target kapasitas produksi yang ingin dicapai minimal 220 unit/bulandi bulan September 2014. Salah satu cara untuk dapat meningkatkan kapasitas produksi adalah dengan melakukan keseimbangan lini pada lini perakitannya. Lini perakitan Medium Size digunakan untuk memproduksi 6 jenis produk. Produk yang diamati adalah Excavator PC 130F-7, Excavator PC 200-8, Excavator PC 300-8, Excavator PC 400-8, Bulldozer D68ESS-12 dan Bulldozer D85ESS-2. Permasalahan pada lini perakitan Medium Size ini termasuk ke dalam klasifikasi General Assembly Line Balancing, karena lini perakitan Medium Size digunakan untuk memproduksi produk yang bervariasi. Untuk dapat memecahkan permasalahan pada lini perakitan ini digunakan metode Mixed Model Assembly Line Balancing yang bertujuan untuk menggabungkan elemen kerja semua produk yang diproduksi di lini tersebut berdasarkan kecepatan produksi. Total waktu keseluruhan produk yang didapatkan dari metode Mixed Model Assembly Line Balancing akan digunakan kedalam perhitungan metode keseimbangan lini. Metode yang dibandingkan dalam penelitian adalah metode integrasi Ranked Positional Weight dan COMSOAL. Hasil penelitian yang dilakukan menunjukkan bahwa performansi lini dengan menggunakan metode COMSOAL memberikan peningkatan yang terbaik yaitu mencapai 93,24% (efisiensilini), balance delay sebesar 6,76%, smoothness index sebesar 8,86 dan dengan kapasitas produksi mencapai 220 unit/bulan (meningkatkan 10,24% dari kapasitas produksi saat ini). Dengan perbaikan tersebut akan berdampak berkurangnya waktu menganggur sebesar 23,61menit/unit dan berpotensi keuntungan secara financial sebesar US$ 94,18/hari atau US$ 1883,57/bulan. Kata Kunci:Keseimbangan Lini, Mixed Model Assembly Line Balancing, RPW, COMSOAL ABSTRACT PT. Komatsu Indonesia is a manufacturing company, producing various heavy equipments and components in ‘make to order’ production system. In 2014, Company have a problem about increase in demand of the products in the Medium Size’s assembly line. In this working line, workload on each workstationis only able to produce 195 units/month (data of August 2014). Production capacity, that is targeted to achieve, is at least 220 units/month in September 2014. One of the ways to increase the production capacity is to perform line balancing on the assembly lines. The Medium Size’s assembly line produces six types of products. The observed products were Excavator PC 130F7, Excavator PC 200-8, Excavator PC 300-8, Excavator PC 400-8, Bulldozer D68ESS-12 dan Bulldozer D85ESS-2. The classification of the problems on the Medium Size’s assembly line is mentioned in the General Assembly Line Balancing because the Medium Size’s assembly line produces various products. To solve the problems on the said assembly line, Mixed Model Assembly Line Balancing is performed as a method, which combines the work elements of all products that are produced on this assembly line based on production speed. The total time of all the products, obtained from the Mixed Model Assembly Line Balancing method, is included in the calculation of line balancing method. The performed method is the method Ranked Positional Weight and COMSOAL. The research results have shown that the line performance with the method of COMSOAL shows the best improvement, reaching 93,24% (line efficiency), 6,76% for balance delay, smoothness index of 8,86, and production capacity of 220 units/month(improve line performance by 10.24%, compared to current the line performance). Effect of their improvement can be reduce idle time until 23,61 minute/unit and potensial profit US$ 94,18/day or US$ 1883,57month. Keywords :Line Balancing, Mixed Model Assembly Line Balancing, COMSOAL

Item Type: Thesis (S1)
Call Number CD: FT/IND 15 002
NIM/NIDN Creators: 41613310019
Uncontrolled Keywords: Keywords :Line Balancing, Mixed Model Assembly Line Balancing, COMSOAL
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.5 Management of Production/Manajemen Produksi
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 06 Jul 2022 05:39
Last Modified: 06 Jul 2022 05:39
URI: http://repository.mercubuana.ac.id/id/eprint/64582

Actions (login required)

View Item View Item