LESTARI, CHRISTINE INDAH (2020) ANALISA PERFORMA PANEL SURYA PADA SISTEM PEMBANGKIT LISTRIK TENAGA SURYA DI POLITEKNIK INDUSTRI ATMI CIKARANG SETELAH 6 TAHUN. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Halaman Judul.pdf Download (43kB) | Preview |
|
|
Text
2. Abstrak.pdf Download (105kB) | Preview |
|
|
Text
3. Lembar Pernyataan.pdf Download (119kB) | Preview |
|
|
Text
4. Lembar Pengesahan.pdf Download (105kB) | Preview |
|
|
Text
5. Kata Pengantar.docx.pdf Download (28kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (24kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (21kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (23kB) | Preview |
|
|
Text
9. Daftar Persamaan.pdf Download (21kB) | Preview |
|
|
Text
10. Daftar Lampiran.pdf Download (21kB) | Preview |
|
Text
11. Bab 1.pdf Restricted to Registered users only Download (32kB) |
||
Text
12. Bab 2.pdf Restricted to Registered users only Download (624kB) |
||
Text
13. Bab 3.pdf Restricted to Registered users only Download (348kB) |
||
Text
14. Bab 4.pdf Restricted to Registered users only Download (256kB) |
||
Text
15. Bab 5.pdf Restricted to Registered users only Download (135kB) |
||
Text
16. Daftar Pustaka.pdf Restricted to Registered users only Download (119kB) |
||
Text
17. Lampiran.pdf Restricted to Registered users only Download (141kB) |
Abstract
ABSTRAK Salah satu kebutuhan dasar kehidupan masyarakat saat ini adalah energi listrik. Kebutuhan energi listrik terus meningkat setiap tahunnya. Pembangkit energi fosil sebagai sumber energi listrik utama tidak akan bertahan lama. Sebagai negara yang terletak di garis khatulistiwa, Indonesia mempunyai sumber energi surya yang melimpah dengan intensitas radiasi matahari rata-rata 4,8 kWh/m2 . Politeknik Industri ATMI Cikarang juga tidak sepenuhnya menggunakan sumber listrik dari PLN tapi ada sebuah gedung yang menggunakan sumber listrik dari Pembangkit Listrik Tenaga Surya (PLTS). PLTS yang ada di Politeknik Industri ATMI Cikarang sudah digunakan selama 6 tahun. Untuk mengetahui performa PLTS setelah 6 tahun, dilakukan pengukuran output tegangan DC pada panel surya yang masuk ke inverter, suhu disekitar panel surya dan intensitas cahaya matahari. Pengukuran dilakukan dari sebelum matahari terbit sampai dengan matahari tenggelam. Hasil pengukuran tegangan maksimal pada inverter 1 yaitu 447 volt DC pada suhu 29,3⁰C dan tegangan maksimal pada inverter 2 yaitu 449 volt DC pada suhu 31⁰C. Intensitas cahaya paling tinggi terjadi pada pukul 13.00 yaitu 149.400 lux. Kata Kunci: Sistem Pembangkit Listrik Tenaga Surya, Tegangan DC, Suhu, Intensitas Cahaya. ABSTRACT The most important from basic needs of people's lives today is electricity. The need for electrical energy continues to increase every year. Fossil energy generation as the main source of electrical energy will not last long. As a country located on the equator, Indonesia has solar energy sources with an average solar radiation intensity of 4.8 kWh / m2 . Polytechnic Industri ATMI Cikarang not only use electricity from PLN, but there is a building that uses electricity from the Solar power plant. Solar power plant in ATMI Cikarang has been used for 6 years. To find out the performance from the solar power plant after 6 years, measurements taken from DC voltage output on solar panels that enter the inverter, the temperature around the solar panel and the intensity of sunlight. Measurements are taken from in the morning before sunrise until sunset. The results of the measurement of the maximum voltage on inverter 1 is 447 volts DC at 29.3°C and the maximum voltage on inverter 2 is 449 volts DC at 31°C. The highest light intensity occurred at 13:00 which is 149,400 lux. Keywords: Solar Power Generation Systems, DC Voltage, Temperature, Light Intensity.
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FE/ELK 20 015 |
NIM/NIDN Creators: | 41418310013 |
Uncontrolled Keywords: | Kata Kunci: Sistem Pembangkit Listrik Tenaga Surya, Tegangan DC, Suhu, Intensitas Cahaya. |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.3 Electrical Engineering, Lighting, Superconductivity, Magnetic Engineering, Applied Optics, Paraphotic Technology, Electronics Communications Engineering, Computers/Teknik Elektro, Pencahayaan, Superkonduktivitas, Teknik Magnetik, Optik Terapan, Tekn |
Divisions: | Fakultas Teknik > Teknik Elektro |
Depositing User: | siti maisyaroh |
Date Deposited: | 07 Jun 2022 03:13 |
Last Modified: | 07 Jun 2022 03:13 |
URI: | http://repository.mercubuana.ac.id/id/eprint/62755 |
Actions (login required)
View Item |