AKBARYAN, ILHAM (2020) PERBAIKAN SISTEM PREVENTIVE MAINTENANCE MESIN AMIXON DENGAN METODE RELIABILITY CENTERED MAINTENANCE DI INDUSTRI FLAVOR AND FRAGRANCE. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Halaman Judul.pdf Download (434kB) | Preview |
|
|
Text
2. Halaman Pernyataan.pdf Download (598kB) | Preview |
|
|
Text
3. Halaman Pengesahan.pdf Download (497kB) | Preview |
|
|
Text
4. Abstrak.pdf Download (46kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (91kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (47kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (43kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (43kB) | Preview |
|
|
Text
9. Daftar Lampiran.pdf Download (40kB) | Preview |
|
Text
10. Bab 1.pdf Restricted to Registered users only Download (124kB) |
||
Text
11. Bab 2.pdf Restricted to Registered users only Download (410kB) |
||
Text
12. Bab 3.pdf Restricted to Registered users only Download (75kB) |
||
Text
13. Bab 4.pdf Restricted to Registered users only Download (395kB) |
||
Text
14. Bab 5.pdf Restricted to Registered users only Download (52kB) |
||
Text
15. Bab 6.pdf Restricted to Registered users only Download (47kB) |
||
Text
16. Daftar Pustaka.pdf Restricted to Registered users only Download (99kB) |
||
Text
17. Lampiran.pdf Restricted to Registered users only Download (96kB) |
Abstract
ABSTRAK Reliability Centered Maintenance (RCM) merupakan suatu metode analisis pemeliharaan yang digunakan untuk menganalisa dan memperbaiki sistem pemeliharaan yang berfokus untuk meningkatkan kehandalan mesin. Permasalahan yang terjadi pada mesin produksi PT. Indesso Culinaroma Internasional adalah masih terjadinya kegagalan mesin yang menyebabkan berhentinya proses produksi di luar jadwal Preventive Maintenance (PM) selama 240,2 jam yang terjadi pada pperiode juli sampai november 2019. Oleh sebab itu dilakukan penelitian terhadap mesin dengan waktu kegagalan mesin tertinggi dari 8 mesin kritis yang menyebabkan mesin berhenti berproduksi. Penelitian dilakukan dengan pengolahan data Time Between Failure (TBF) sesuai pola distribusi probabilitasnya yang kemudian dihitung tingkat kehandalan mesin sebelum dan sesudah dilakukannya perbaikan interval waktu preventive maintenance. Hasil analisisnya menunjukkan bahwa mesin amixon mengalami peningkatan kehandalan sebesar 25,35 % apabila dilakukan perbaikan preventive maintenance selama 5,17 jam atau setelah 2 kali mesin amixon melakukan proses produksi. Kata Kunci: Maintenance, Preventive Maintenance (PM), Reliability Centered Maintenance (RCM), Reliability ABSTRACT Reliability Centered Maintenance (RCM) is a maintenance analysis method used to analyze and improve maintenance systems that focus on improving machine reliability. The problems that occur in PT. Indesso Culinaroma Internasional is that there are still machine failures that cause the production process to stop outside the Preventive Maintenance (PM) schedule for 240.2 hours that occurred in the period July to November 2019. Therefore, a study was conducted on the machine with the highest engine failure time of 8 critical machines which caused the machine to stop producing.The research was conducted by processing Time Between Failure (TBF) data according to the probability distribution pattern which then calculated the level of machine reliability before and after the preventive maintenance time interval repair was made. The results of the analysis show that the amixon machine has increased reliability by 25,35 % when preventive maintenance repairs are carried out for 5.17 hours or after 2 times the amixon machine carries out the production process. Keywords: Maintenance, Preventive Maintenance (PM), Reliability Centered Maintenance (RCM), Reliability
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 20 055 |
NIM/NIDN Creators: | 41616210002 |
Uncontrolled Keywords: | Kata Kunci: Maintenance, Preventive Maintenance (PM), Reliability Centered Maintenance (RCM), Reliability |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 19 May 2022 04:00 |
Last Modified: | 19 May 2022 04:00 |
URI: | http://repository.mercubuana.ac.id/id/eprint/61308 |
Actions (login required)
View Item |