USULAN RE-LAYOUT GUDANG RAW MATERIAL DENGAN MENGGUNAKAN METODE SHARED STORAGE DI PT HOTMAL JAYA PERKASA TANGERANG

FADILLA, MUTIARA ZULUL (2018) USULAN RE-LAYOUT GUDANG RAW MATERIAL DENGAN MENGGUNAKAN METODE SHARED STORAGE DI PT HOTMAL JAYA PERKASA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. Halaman Judul.pdf

Download (88kB) | Preview
[img]
Preview
Text (ABSTRAK)
4. Abstrak.pdf

Download (88kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
2. Lembar Pernyataan.pdf

Download (205kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan.pdf

Download (167kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf

Download (135kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
6. Daftar Isi.pdf

Download (132kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
7. Daftar Tabel.pdf

Download (167kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
8. Daftar Gambar.pdf

Download (166kB) | Preview
[img] Text (BAB I)
9. Bab 1.pdf
Restricted to Registered users only

Download (139kB)
[img] Text (BAB II)
10. Bab 2.pdf
Restricted to Registered users only

Download (284kB)
[img] Text (BAB III)
11. Bab 3.pdf
Restricted to Registered users only

Download (376kB)
[img] Text (BAB IV)
12. Bab 4.pdf
Restricted to Registered users only

Download (883kB)
[img] Text (BAB V)
13. Bab 5.pdf
Restricted to Registered users only

Download (265kB)
[img] Text (BAB VI)
14. Bab 6.pdf
Restricted to Registered users only

Download (84kB)
[img] Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf
Restricted to Registered users only

Download (171kB)
[img] Text (LAMPIRAN)
16. lampiran.pdf
Restricted to Registered users only

Download (160kB)

Abstract

Facility layout is a collection of physically arranged elements. Physical elements can use machines, tools, buildings, etc. The unfavorable layout of the warehouses can lead to the flow of less organized materials which can cause many problems such as the misuse of raw material, raw materials that are not well ordered, the warehouse becomes messy and many more problems will occur. PT Hotmal Jaya Perkasa (PT HJP) is one of the companies engaged in the field of metal coating in Indonesia. In the observations made for the placement of raw material products, the warehouse is still not organized or neatly in the preparation of the product, so things like this cause many problems in the timing of the product in a warehouse area and make it difficult for workers, the head of the warehouse in checking the goods will be in production. Other conditions also exist in the placement of products in an area that is less precise, which should be goods that have the highest frequency of delivery and are often in and out closer to the exit. The method used in warehouse management is the shared storage approach where the product that has the highest frequency of delivery and which is often in and out is brought close to the entrance to minimize moving material handling distance. The result of the shared storage approach can be that the proposed layout has a total mileage that is smaller than the initial layout with the improvement of the storage media structure. The total first layout distance is 1656 meters. The total distance of the proposed layout is 960,5 meters. There is a difference in total mileage value of 695,5 meters from the total initial mileage. This means the proposed layout can shorten the distance traveled by the warehouse employees in picking up the goods. Keywords: Warehouse, Shared Storage Method, Proposed Warehouse Layout, Manufactur, Metal, Raw Material Facility layout is a collection of physically arranged elements. Physical elements can use machines, tools, buildings, etc. The unfavorable layout of the warehouses can lead to the flow of less organized materials which can cause many problems such as the misuse of raw material, raw materials that are not well ordered, the warehouse becomes messy and many more problems will occur. PT Hotmal Jaya Perkasa (PT HJP) is one of the companies engaged in the field of metal coating in Indonesia. In the observations made for the placement of raw material products, the warehouse is still not organized or neatly in the preparation of the product, so things like this cause many problems in the timing of the product in a warehouse area and make it difficult for workers, the head of the warehouse in checking the goods will be in production. Other conditions also exist in the placement of products in an area that is less precise, which should be goods that have the highest frequency of delivery and are often in and out closer to the exit. The method used in warehouse management is the shared storage approach where the product that has the highest frequency of delivery and which is often in and out is brought close to the entrance to minimize moving material handling distance. The result of the shared storage approach can be that the proposed layout has a total mileage that is smaller than the initial layout with the improvement of the storage media structure. The total first layout distance is 1656 meters. The total distance of the proposed layout is 960,5 meters. There is a difference in total mileage value of 695,5 meters from the total initial mileage. This means the proposed layout can shorten the distance traveled by the warehouse employees in picking up the goods. Keywords: Warehouse, Shared Storage Method, Proposed Warehouse Layout, Manufactur, Metal, Raw Material

Item Type: Thesis (S1)
Call Number CD: FT/IND. 19 088
Call Number: ST/16/18/006
NIM/NIDN Creators: 41614010043
Uncontrolled Keywords: Warehouse, Shared Storage Method, Proposed Warehouse Layout, Manufactur, Metal, Raw Material
Subjects: 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 693 Construction In Specific Types of Materials and For Specific Purposes/Konstruksi Dalam Jenis Bahan Khusus dan Untuk Tujuan Khusus > 693.9 Construction in Other Materials/Konstruksi Bangunan Menggunakan Material Lainnya
700 Arts/Seni, Seni Rupa, Kesenian > 730 Plastic Arts and Sculpture/Seni Plastik dan Seni Patung > 738 Ceramics Arts/Seni Keramik > 738.1 Techniques and Procedures of Ceramics Arts/Teknik Seni Keramik, Prosedur Seni Keramik > 738.12 Materials/Bahan
700 Arts/Seni, Seni Rupa, Kesenian > 730 Plastic Arts and Sculpture/Seni Plastik dan Seni Patung > 739 Art Metalwork/Seni Logam, Kerajinan Logam
700 Arts/Seni, Seni Rupa, Kesenian > 730 Plastic Arts and Sculpture/Seni Plastik dan Seni Patung > 739 Art Metalwork/Seni Logam, Kerajinan Logam > 739.1 Techniques and Procedures of Art Metalwork/Teknik Seni Logam, Prosedur Seni Logam
700 Arts/Seni, Seni Rupa, Kesenian > 730 Plastic Arts and Sculpture/Seni Plastik dan Seni Patung > 739 Art Metalwork/Seni Logam, Kerajinan Logam > 739.1 Techniques and Procedures of Art Metalwork/Teknik Seni Logam, Prosedur Seni Logam > 739.12 Materials/Bahan
700 Arts/Seni, Seni Rupa, Kesenian > 770 Photography and Photographs/Seni Fotografi dan Foto > 771 Techniques and Procedures/Teknik Seni Fotografi dan Foto, Prosedur Seni Fotografi dan Foto > 771.5 Chemical Materials of Photography/Bahan-bahan Kimia Fotografi > 771.52 Support Materials/Bahan Pendukung
700 Arts/Seni, Seni Rupa, Kesenian > 780 Music/Seni Musik > 780.1-780.9 Standard Subdivisions of Music/Subdivisi Standar Dari Seni Musik > 780.2 Miscellany of Music/Aneka Ragam tentang Seni Musik > 780.28 Auxiliary Techniques and Procedures; Apparatus, Equipment, Materials/Teknik dan Prosedur Tambahan; Peralatan, Perlengkapan, Bahan-bahan
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Dede Muksin Lubis
Date Deposited: 22 Jan 2019 01:22
Last Modified: 24 Feb 2023 08:11
URI: http://repository.mercubuana.ac.id/id/eprint/46773

Actions (login required)

View Item View Item