KORNIAWAN, TATANG (2016) ANALISIS PRODUKTIVITAS PEKERJAAN INSTALASI FACADE CURTAIN WALL UNITIZED SYSTEM PADA PROYEK HIGH RISE BUILDING DENGAN METODE SIMULASI OPERASI KONSTRUKSI BERULANG (CYCLONE). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Hal Cover.pdf Download (474kB) | Preview |
|
|
Text (ABSTRAK)
Abstrak.pdf Download (48kB) | Preview |
|
Text (BAB I)
Bab 1 Pendahuluan.pdf Restricted to Registered users only Download (209kB) |
||
Text (BAB II)
Bab 2 Tinjauan Pustaka.pdf Restricted to Registered users only Download (672kB) |
||
Text (BAB III)
Bab 3 Metodologi Penelitian.pdf Restricted to Registered users only Download (146kB) |
||
Text (BAB IV)
Bab 4 Analisa dan Pembahasan.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
Bab 5 Simpulan dan Saran.pdf Restricted to Registered users only Download (49kB) |
||
Text (DAFTAR PUSTAKA, LAMPIRAN)
Hal Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (3MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 16 127 |
NIM/NIDN Creators: | 41111120047 |
Uncontrolled Keywords: | Curtain Wall Unitized System, Cyclone, Webcyclone, Facade, Simulation, Productivity |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 20 Aug 2016 11:50 |
Last Modified: | 28 Jul 2022 13:26 |
URI: | http://repository.mercubuana.ac.id/id/eprint/4656 |
Actions (login required)
View Item |