ANALISIS PRODUKTIVITAS PEKERJAAN INSTALASI FACADE CURTAIN WALL UNITIZED SYSTEM PADA PROYEK HIGH RISE BUILDING DENGAN METODE SIMULASI OPERASI KONSTRUKSI BERULANG (CYCLONE)

KORNIAWAN, TATANG (2016) ANALISIS PRODUKTIVITAS PEKERJAAN INSTALASI FACADE CURTAIN WALL UNITIZED SYSTEM PADA PROYEK HIGH RISE BUILDING DENGAN METODE SIMULASI OPERASI KONSTRUKSI BERULANG (CYCLONE). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
Hal Cover.pdf

Download (474kB) | Preview
[img]
Preview
Text (ABSTRAK)
Abstrak.pdf

Download (48kB) | Preview
[img] Text (BAB I)
Bab 1 Pendahuluan.pdf
Restricted to Registered users only

Download (209kB)
[img] Text (BAB II)
Bab 2 Tinjauan Pustaka.pdf
Restricted to Registered users only

Download (672kB)
[img] Text (BAB III)
Bab 3 Metodologi Penelitian.pdf
Restricted to Registered users only

Download (146kB)
[img] Text (BAB IV)
Bab 4 Analisa dan Pembahasan.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB V)
Bab 5 Simpulan dan Saran.pdf
Restricted to Registered users only

Download (49kB)
[img] Text (DAFTAR PUSTAKA, LAMPIRAN)
Hal Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (3MB)
Item Type: Thesis (S1)
Call Number CD: FT/SIP. 16 127
NIM/NIDN Creators: 41111120047
Uncontrolled Keywords: Curtain Wall Unitized System, Cyclone, Webcyclone, Facade, Simulation, Productivity
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 20 Aug 2016 11:50
Last Modified: 28 Jul 2022 13:26
URI: http://repository.mercubuana.ac.id/id/eprint/4656

Actions (login required)

View Item View Item