ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK INFRASTRUCTURE FLY OVER

ARIFIN, MUHAMMAD ZAENAL (2016) ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK INFRASTRUCTURE FLY OVER. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
Hal Cover.pdf

Download (423kB) | Preview
[img]
Preview
Text (ABSTRAK)
Abstrak.doc.pdf

Download (41kB) | Preview
[img] Text (BAB I)
BAB I.pdf
Restricted to Registered users only

Download (384kB)
[img] Text (BAB II)
BAB II.pdf
Restricted to Registered users only

Download (478kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Registered users only

Download (397kB)
[img] Text (BAB IV)
Bab IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB V)
BAB V.pdf
Restricted to Registered users only

Download (203kB)
[img] Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (71kB)
Item Type: Thesis (S1)
Call Number CD: FT/SIP. 16 022
NIM/NIDN Creators: 41111120046
Uncontrolled Keywords: Pier Head, Cast In Situ, Precast, Biaya, Waktu
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 30 Jun 2016 11:12
Last Modified: 28 Jul 2022 13:22
URI: http://repository.mercubuana.ac.id/id/eprint/4040

Actions (login required)

View Item View Item