p, Marlon brando (2006) Analisa perancangan tata letak fasilitas pada bagian produksi di pt NLT Basket MFG cikupa tengerang. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.Item Type: | Thesis (S1) |
---|---|
Call Number CD: | Lt III |
Call Number: | STI/06/326 BRA a |
NIM/NIDN Creators: | 01600-026 |
Uncontrolled Keywords: | Analisa |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 10 Aug 2007 11:30 |
Last Modified: | 06 Jul 2017 03:19 |
URI: | http://repository.mercubuana.ac.id/id/eprint/37141 |
Actions (login required)
View Item |