Husin, Ahmad (2005) Perhitungan waktu baku untuk menentukan jmh pekerja dg mengukur beban kerja supply packing material pd PT.''X''. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.Abstract
Abstraksi kosong
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | Lantai III |
Call Number: | STI/05/160 HUS p |
NIM/NIDN Creators: | 01600-002 |
Uncontrolled Keywords: | WAKTU BAKU |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 27 Apr 2006 14:33 |
Last Modified: | 06 Jul 2017 03:16 |
URI: | http://repository.mercubuana.ac.id/id/eprint/36559 |
Actions (login required)
View Item |