Trianilisma, Yeni (2006) Penggunaan Critical Path Methode Dalam Penjadwalan Kegiatan Produksi Transfpormer Di PT.XXX. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | LT.III |
| Call Number: | STI/06/035 TRI p |
| NIM/NIDN Creators: | 0160311-062 |
| Uncontrolled Keywords: | CRITICAL PATH METHODE |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 25 Feb 2008 10:17 |
| Last Modified: | 27 Jul 2026 01:50 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/31441 |
Actions (login required)
![]() |
View Item |
