P, Ricardo (2006) Analisis penentuan interval waktu penggantian komponen yang optimal berdasarkan biaya dengan metode distribusi wellbull pada PT.Coates Hire Indonesia, Jakarta. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | LT.III |
| Call Number: | STI/06/26 RIC a |
| NIM/NIDN Creators: | 0160312-032 |
| Uncontrolled Keywords: | ANALISIS PENENTUAN INTERVAL WAKTU |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 13 Nov 2006 12:42 |
| Last Modified: | 21 Jul 2026 03:58 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/31260 |
Actions (login required)
![]() |
View Item |
