Usmiati, (2012) PERHITUNGAN DAN PENGUKURAN LAYER 1 DAN LAYER 2 JARINGAN BACKBONE 3G GSM PADA METRO ETHERNET RUAS PASAR SENI-ANCOL AREA JAKARTA UTARA. S1 thesis, Universitas Mercu Buana.
|
Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (1MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/ELK. 12 040 |
| Call Number: | STI/14/12/040 |
| NIM/NIDN Creators: | 41410110082 |
| Uncontrolled Keywords: | Metro Ethernet , GSM 3G , OSI Layer 1 , osi layer 2 , Throughput , Latency , Dan Frame Loss |
| Divisions: | Fakultas Teknik > Teknik Elektro |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 17 Apr 2012 16:20 |
| Last Modified: | 22 Dec 2025 06:53 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/20708 |
Actions (login required)
![]() |
View Item |
