Suherman, (2012) MANAJEMEN KLAIM PENAMBAHAN BIAYA BERDASARKAN KAIDAH FIDIC GENERAL CONDITIONS OF CONTRACT FOR CONSTRUCTION (STUDI KASUS PROYEK CIREBON SUPER BLOK CSB) Mall Cirebon. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
01.Hal Cover.pdf Download (1MB) | Preview |
|
|
Text (ABSTRAK)
02. abstrak r.pdf Download (71kB) | Preview |
|
Text (BAB I)
03. BAB I proposal judul revisi 3.pdf Restricted to Registered users only Download (146kB) |
||
Text (BAB II)
04. BAB 2.pdf Restricted to Registered users only Download (191kB) |
||
Text (BAB III)
05. BAB 3.pdf Restricted to Registered users only Download (236kB) |
||
Text (BAB IV)
06. BAB 4 r1.pdf Restricted to Registered users only Download (475kB) |
||
Text (BAB V)
07. BAB 5.pdf Restricted to Registered users only Download (100kB) |
||
Text (DAFTAR PUSTAKA)
08.Hal Daftar Pustaka.pdf Restricted to Registered users only Download (336kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FTPD/SIP. 12 008 |
Call Number: | STSP/11/12/008 |
NIM/NIDN Creators: | 41106120039 |
Uncontrolled Keywords: | pekerjaan tambah, klaim, kontrak |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 Mar 2012 13:25 |
Last Modified: | 23 Aug 2022 07:57 |
URI: | http://repository.mercubuana.ac.id/id/eprint/20383 |
Actions (login required)
View Item |