CAHYONO, DWI AGUS (2011) ANALISIS EFEKTIVITAS MESIN MILL #1 DENGAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE PADA PT. INDONESIA STEEL TUBE WORK. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. COVER.pdf Download (124kB) | Preview |
|
|
Text (ABSTRAK)
2. ABSTRAK.pdf Download (31kB) | Preview |
|
Text (BAB I)
3. BAB I.pdf Restricted to Registered users only Download (94kB) |
||
Text (BAB II)
4. BAB II.pdf Restricted to Registered users only Download (432kB) |
||
Text (BAB III)
5. BAB III.pdf Restricted to Registered users only Download (37kB) |
||
Text (BAB IV)
6. BAB IV.pdf Restricted to Registered users only Download (911kB) |
||
Text (BAB V)
7. BAB V.pdf Restricted to Registered users only Download (130kB) |
||
Text (BAB VI)
8. BAB VI.pdf Restricted to Registered users only Download (45kB) |
Abstract
PT. Indonesia Steel Tube Works at Jakarta is corporate production one steel pipe and mill #1 constitutes either one machine fifth mill whatever available and oldest its age, having production capacity 3.3 tons / the time of day, faced constraint is problem that get bearing with machine effectiveness / equipment that begat by Six Big Losses. It visually of be not been reached it production target already been established. Intermediated by effort faces effort emulation that progressively tight, the need accomplishment to customer and charge for progressively increase production target therefore needful strategy for its attainment. One of it is apply Total Productive Maintenance (TPM) by use of yardstick Overall Equipment Effectiveness (OEE). TPM constitute one of method which is developed at Japan, can be utilized to increase productivity and efesiensi production, imprecise it handle and machine preserve / equipment not only cause damage problem on machine but also evoke loss any other so-called with Six Big Losses . meanwhile OEE will stand in good stead if done by grouping and count on a regular basis will show promise that clear for improvement. Implement methodics Total Productive Maintenance was successful increases average value Overall Equipment Effectiveness (OEE) Year 2009 as big as 71.54% as 87.7% on Year 2010, or step-up happening as big as 16.2%. so loss estimation that can be saved is as big as Rp.1.050.231.600 / Year
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 11 044 |
Call Number: | STI/16/11/028 |
NIM/NIDN Creators: | 41606120008 |
Uncontrolled Keywords: | six big losses, total productive maintenance, overall Equipment effectiveness, Produktifitas, efisie |
Subjects: | 100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 15 Apr 2011 11:03 |
Last Modified: | 20 Apr 2024 04:22 |
URI: | http://repository.mercubuana.ac.id/id/eprint/19300 |
Actions (login required)
View Item |