Analisis Keterlambatan Proyek Konstruksi Dengan Menggunakan Prima Vera 6 Versi 7 Studi Kasus Pada Pembangunan Gedung Gereja Polikarpus

Darmawan, Muhammad (2011) Analisis Keterlambatan Proyek Konstruksi Dengan Menggunakan Prima Vera 6 Versi 7 Studi Kasus Pada Pembangunan Gedung Gereja Polikarpus. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
Isi_cover_721554097242.pdf

Download (81kB) | Preview
[img]
Preview
Text (ABSTRAK)
Isi_abstract_416514289219.pdf

Download (12kB) | Preview
[img] Text (BAB I)
Isi1112573279141.pdf
Restricted to Registered users only

Download (93kB)
[img] Text (BAB II)
Isi2398796888038.pdf
Restricted to Registered users only

Download (284kB)
[img] Text (BAB III)
Isi3321593795319.pdf
Restricted to Registered users only

Download (115kB)
[img] Text (BAB IV)
Isi4620373962448.pdf
Restricted to Registered users only

Download (3MB)
[img] Text (BAB V)
Isi5996536419876.pdf
Restricted to Registered users only

Download (72kB)
[img] Text (DAFTAR PUSTAKA)
Isi_pustaka655567939944.pdf
Restricted to Registered users only

Download (12kB)
Item Type: Thesis (S1)
Call Number CD: FTPD/SIP. 11 008
Call Number: STSP/11/11/044
NIM/NIDN Creators: 41107120023
Uncontrolled Keywords: Analisis, Keterlambatan,Proyek, Report, Realisasi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 20 Sep 2011 14:35
Last Modified: 07 Sep 2022 08:39
URI: http://repository.mercubuana.ac.id/id/eprint/18711

Actions (login required)

View Item View Item