Darmawan, Muhammad (2011) Analisis Keterlambatan Proyek Konstruksi Dengan Menggunakan Prima Vera 6 Versi 7 Studi Kasus Pada Pembangunan Gedung Gereja Polikarpus. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Isi_cover_721554097242.pdf Download (81kB) | Preview |
|
|
Text (ABSTRAK)
Isi_abstract_416514289219.pdf Download (12kB) | Preview |
|
Text (BAB I)
Isi1112573279141.pdf Restricted to Registered users only Download (93kB) |
||
Text (BAB II)
Isi2398796888038.pdf Restricted to Registered users only Download (284kB) |
||
Text (BAB III)
Isi3321593795319.pdf Restricted to Registered users only Download (115kB) |
||
Text (BAB IV)
Isi4620373962448.pdf Restricted to Registered users only Download (3MB) |
||
Text (BAB V)
Isi5996536419876.pdf Restricted to Registered users only Download (72kB) |
||
Text (DAFTAR PUSTAKA)
Isi_pustaka655567939944.pdf Restricted to Registered users only Download (12kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FTPD/SIP. 11 008 |
Call Number: | STSP/11/11/044 |
NIM/NIDN Creators: | 41107120023 |
Uncontrolled Keywords: | Analisis, Keterlambatan,Proyek, Report, Realisasi |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 20 Sep 2011 14:35 |
Last Modified: | 07 Sep 2022 08:39 |
URI: | http://repository.mercubuana.ac.id/id/eprint/18711 |
Actions (login required)
View Item |