Ruswanto, Tulus Puji (2012) Analisa Perbaikan Metode Kerja Serta Penetapan Waktu Baku Kerja Hasil Perbaikan Dengan Time Study Untuk Pemeriksaan Ulang Acak Ban Radial Pada PT XYZ Tbk. S1 thesis, Universitas Mercu Buana.
|
Text (COVER)
Hal Cover.pdf Download (374kB) | Preview |
|
|
Text (ABSTRAK)
abstrak Indo.pdf Download (28kB) | Preview |
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (38kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (434kB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (13MB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (6MB) |
||
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (51kB) |
||
Text (LAMPIRAN)
Lampiran 1.pdf Restricted to Registered users only Download (153kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 12 083 |
Call Number: | STI/16/12/083 |
NIM/NIDN Creators: | 41610120053 |
Uncontrolled Keywords: | Motion Study, Waktu Baku, Anthropometri , Time Study |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 26 Sep 2012 12:02 |
Last Modified: | 23 Jun 2022 02:05 |
URI: | http://repository.mercubuana.ac.id/id/eprint/17890 |
Actions (login required)
View Item |