ANALISIS NETWORK PLANNING DALAM RANGKA EFESIENSI WAKTU DAN BIAYA PROYEK PENYEDIAAN RUMAN SUSUN PP -AN-NUR MALANG - JAWA TIMUR.

MUTIAS, EFITRA KASENKA (2013) ANALISIS NETWORK PLANNING DALAM RANGKA EFESIENSI WAKTU DAN BIAYA PROYEK PENYEDIAAN RUMAN SUSUN PP -AN-NUR MALANG - JAWA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

[img] Text (SKRIPSI FULL)
SKRIPSI FULL.pdf
Restricted to Registered users only

Download (1MB)
Item Type: Thesis (S1)
Call Number CD: FE/MJ. 13 060
Call Number: SE/31/13/060
NIM/NIDN Creators: 43108010212
Uncontrolled Keywords: Critical path method, proyek percepatan
Subjects: 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 000. Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 004 Data Processing, Computer Science/Pemrosesan Data, Ilmu Komputer, Teknik Informatika > 004.6 Interfacing and Communications/Tampilan Antar Muka (Interface) dan Jaringan Komunikasi Komputer > 004.68 Local Area Network (LAN)/Local Area Network
100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Admin Perpus UMB
Date Deposited: 28 Mar 2013 13:01
Last Modified: 28 Mar 2026 07:52
URI: http://repository.mercubuana.ac.id/id/eprint/15937

Actions (login required)

View Item View Item