ANALISA STANDARD COST PADA MESIN PWHT (POST WELD HEAT TREATMENT) DENGAN METODE FULL COSTING UNTUK PENGENDALIAN BIAYA PRODUKSI DI PT. KOMATSU INDONESIA

MURJOKO, ALI (2013) ANALISA STANDARD COST PADA MESIN PWHT (POST WELD HEAT TREATMENT) DENGAN METODE FULL COSTING UNTUK PENGENDALIAN BIAYA PRODUKSI DI PT. KOMATSU INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

[img] Text (SKRIPSI FULL)
SKRIPSI FULL.pdf
Restricted to Registered users only

Download (3MB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 13 057
Call Number: ST/16/13/078
NIM/NIDN Creators: 41611120061
Uncontrolled Keywords: PWHT, standart cost, full costing method, profitabilty
Subjects: 100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis
200 Religion/Agama > 290 Other Religions/Agama Selain Kristen > 297 Agama Islam/Islam > 297.4 Islamic law/Hukum Islam > 297.43 Muamalat/Muamalat > 297.434 Company/Perseroan
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 27 Sep 2013 10:39
Last Modified: 10 Mar 2026 07:48
URI: http://repository.mercubuana.ac.id/id/eprint/14759

Actions (login required)

View Item View Item