ERWANDI, HERMAN (2013) Analisa Penjadwalan Produksi Kusen, Pintu, Daun Jendela Di Ud. Sinar Kamper Dengan Metode EDD, SPT, LPT DAN FCFS. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1 cover.pdf Download (1MB) | Preview |
|
|
Text (ABSTRAK)
2 ABSTRAK.pdf Download (154kB) | Preview |
|
Text (BAB I)
3 BAB I.pdf Restricted to Registered users only Download (383kB) |
||
Text (BAB II)
4 BAB II.pdf Restricted to Repository staff only Download (3MB) |
||
Text (BAB III)
5 BAB III.pdf Restricted to Registered users only Download (235kB) |
||
Text (BAB IV)
6 BAB IV.pdf Restricted to Registered users only Download (569kB) |
||
Text (BAB V)
7 BAB V.pdf Restricted to Registered users only Download (247kB) |
||
Text (BAB VI)
8 BAB VI.pdf Restricted to Registered users only Download (690kB) |
||
Text (DAFTAR PUSTAKA)
9 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (229kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 13 068 |
Call Number: | ST/16/13/068 |
NIM/NIDN Creators: | 41609110077 |
Uncontrolled Keywords: | penjadwalan, waktu produksi, metode FCFS, SPT, LPT, EDD |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 08 Sep 2013 15:25 |
Last Modified: | 21 Nov 2022 07:20 |
URI: | http://repository.mercubuana.ac.id/id/eprint/14712 |
Actions (login required)
View Item |