WARDHANI, NIKEN LUKITA (2013) Penjadwalan Penyelesaian Konstruksi Top Coat Booth Expansion Menggunakan Analisis Jaringan Kerja. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Isi_cover_312980972558.pdf Download (295kB) | Preview |
|
|
Text (ABSTRAK)
Isi_abstract_578266059706.pdf Download (173kB) | Preview |
|
Text (BAB I)
Isi1438372806502.pdf Restricted to Registered users only Download (182kB) |
||
Text (BAB II)
Isi2870174588924.pdf Restricted to Registered users only Download (413kB) |
||
Text (BAB III)
Isi3208687642427.pdf Restricted to Registered users only Download (179kB) |
||
Text (BAB IV)
Isi4713624312827.pdf Restricted to Registered users only Download (681kB) |
||
Text (BAB V)
Isi5565830344206.pdf Restricted to Registered users only Download (420kB) |
||
Text (BAB VI)
Isi6150135013049.pdf Restricted to Registered users only Download (96kB) |
||
Text (DAFTAR PUSTAKA)
Isi_pustaka684184776207.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number: | ST/16/13/161 |
NIM/NIDN Creators: | 41611120020 |
Uncontrolled Keywords: | penjadwalan, analisis jaringan kerja, cpm-pert, percepatan |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 23 Aug 2013 14:00 |
Last Modified: | 10 Nov 2022 02:24 |
URI: | http://repository.mercubuana.ac.id/id/eprint/14690 |
Actions (login required)
View Item |