MANURUNG, ERIKSON (2014) INCREASE CAPACITY BEARBRAND UNTUK MENCAPAI PRODUCTION PLANNING 88000 CASE PER WEEK DENGAN MENGURANGI DOWN TIME CLEANING. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Halaman Judul.pdf Download (649kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (22kB) | Preview |
|
Text (BAB I)
3. BAB I.pdf Restricted to Registered users only Download (74kB) |
||
Text (BAB II)
4. BAB II.pdf Restricted to Registered users only Download (295kB) |
||
Text (BAB III)
5. BAB III.pdf Restricted to Registered users only Download (403kB) |
||
Text (BAB IV)
6. BAB IV.pdf Restricted to Registered users only Download (806kB) |
||
Text (BAB V)
7. BAB V.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB VI)
8. BAB VI.pdf Restricted to Registered users only Download (850kB) |
||
Text (DAFTAR PUSTAKA)
9. Hal Daftar Pustaka.pdf Restricted to Registered users only Download (347kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 14 118 |
NIM/NIDN Creators: | 41608110029 |
Uncontrolled Keywords: | INCREASE CAPACITY BEARBRAND UNTUK MENCAPAI PRODUCTION PLANNING 88000 CASE PER WEEK DENGAN MENGURANGI |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 02 Feb 2014 12:28 |
Last Modified: | 16 Nov 2022 13:32 |
URI: | http://repository.mercubuana.ac.id/id/eprint/11322 |
Actions (login required)
View Item |