HAMZAH, ZAKI (2014) Analisa Penerapan Lean Thinking untuk Optimasi Manajemen Material pada Proyek Instalasi Mekanikal - Elektrikal pada pembangunan pabrik IHI-TIGAR 50 TPD Prototype Plant. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Halaman Cover.pdf Restricted to Registered users only Download (617kB) |
|
|
Text (ABSTRAK)
Abstrak.pdf Restricted to Registered users only Download (79kB) |
|
|
Text (BAB I)
BAB 1.pdf Restricted to Registered users only Download (115kB) |
|
|
Text (BAB II)
BAB 2.pdf Restricted to Registered users only Download (182kB) |
|
|
Text (BAB III)
BAB 3.pdf Restricted to Registered users only Download (178kB) |
|
|
Text (BAB IV)
BAB 4.pdf Restricted to Registered users only Download (975kB) |
|
|
Text (BAB V)
BAB 5.pdf Restricted to Registered users only Download (137kB) |
|
|
Text (BAB VI)
BAB 6.pdf Restricted to Registered users only Download (25kB) |
|
|
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Daftar Pustaka-Lampiran.pdf Restricted to Registered users only Download (482kB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/IND. 14 006 |
| NIM/NIDN Creators: | 41612120065 |
| Uncontrolled Keywords: | Lean Thinking, Lot Sizing, Manajemen Material, Proyek |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 31 Aug 2014 15:56 |
| Last Modified: | 07 Apr 2026 08:23 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/11201 |
Actions (login required)
![]() |
View Item |
