MULYA, RUDINI (2014) MINIMASI WASTE DAN USULAN PENINGKATAN EFISIENSI PROSES PRODUKSI MCB (MINI CIRCUIT BREAKER) DENGAN PENDEKATAN SISTEM LEAN MANUFACTURING DI PT. SCHNEIDER ELECTRIC INDONESIA. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (206kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (920kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (282kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (768kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (261kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (1MB) |
||
Text (Bab 6)
Bab 6.pdf Restricted to Registered users only Download (379kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (3MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 14 094 |
NIM/NIDN Creators: | 41610010035 |
Uncontrolled Keywords: | Lean Manufacturing, Seven Waste, Value Stream Analysis Tools (VALSAT), Value Stream Mapping (VSM), K |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 18 Aug 2014 10:12 |
Last Modified: | 10 May 2017 07:03 |
URI: | http://repository.mercubuana.ac.id/id/eprint/11185 |
Actions (login required)
View Item |