Raif, Agus (2014) PERHITUNGAN WAKTU ANTAR KERUSAKAN MESIN DI BAGIAN CANNING LINE DI PT. MULTI BINTANG INDONESIA. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (187kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (498kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (262kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (382kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (515kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (689kB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (197kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41610010047 |
Uncontrolled Keywords: | Canning Line, Preventive Maintenance, Corrective Maintenance, Machine Reliability Level |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 05 Aug 2014 11:12 |
Last Modified: | 10 May 2017 06:48 |
URI: | http://repository.mercubuana.ac.id/id/eprint/10900 |
Actions (login required)
View Item |