WIDIATMOKO, ARIYADI (2025) PEMILIHAN LOKASI PLTS ATAP DI PABRIK DI PROPINSI JAWA TENGAH MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). S2 thesis, Universitas Mercu Buana-Menteng.
![]() |
Text (COVER)
55121120073-Ariyadi Widiatmoko-01 Cover_rev2 - Ariyadi Widiatmoko.pdf Download (2MB) |
![]() |
Text (BAB I)
55121120073-Ariyadi Widiatmoko-02 Bab 1 - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (841kB) |
![]() |
Text (BAB II)
55121120073-Ariyadi Widiatmoko-03 Bab 2 - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (BAB III)
55121120073-Ariyadi Widiatmoko-04 Bab 3 - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (857kB) |
![]() |
Text (BAB IV)
55121120073-Ariyadi Widiatmoko-05 Bab 4 - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (BAB V)
55121120073-Ariyadi Widiatmoko-06 Bab 5 - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (499kB) |
![]() |
Text (DAFTAR PUSTAKA)
55121120073-Ariyadi Widiatmoko-08 Daftar Pustaka - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (521kB) |
![]() |
Text (LAMPIRAN)
55121120073-Ariyadi Widiatmoko-09 Lampiran - Ariyadi Widiatmoko.pdf Restricted to Registered users only Download (633kB) |
Abstract
Penelitian ini bertujuan menentukan lokasi optimal pemasangan PLTS atap di pabrik di Jawa Tengah menggunakan metode AHP. Empat lokasi di Brebes, Tegal, Jepara, dan Rembang dievaluasi berdasarkan kriteria teknis, ekonomi, waktu, dan kualitas proyek. Data dari 6 pakar dan sumber sekunder dianalisis dengan Expert Choice 11.1. Hasil menunjukkan Pabrik C di Jepara sebagai lokasi terbaik (skor global: 0,289), didukung luas atap besar (25.000 m²), beban listrik tinggi (2.400 kW/hari), dan harga EPC terendah (Rp7.500/Wp). Kriteria dominan adalah PLTS Terpasang (32,7%), dengan luas atap sebagai subkriteria utama. Analisis sensitivitas membuktikan ketahanan hasil. Penelitian ini memberikan kerangka keputusan terstruktur yang mengintegrasikan aspek manajemen proyek, mendukung percepatan adopsi PLTS secara berbasis data oleh developer, industri, dan regulator. This study aims to determine the optimal location for rooftop solar PV installation in factories in Central Java using the Analytical Hierarchy Process (AHP). Four industrial sites in Brebes, Tegal, Jepara, and Rembang were evaluated based on technical, economic, time, and quality criteria. Data from six expert assessments and secondary sources were analyzed using Expert Choice 11.1. The results show that Factory C in Jepara is the most optimal location (global score: 0.289), primarily due to its large roof area (25,000 m²), high electricity load (2,400 kW/day), and lowest EPC price (Rp7,500/Wp). The most dominant criterion is Installed PV Capacity (32.7%), with roof area being the key sub-criterion. Sensitivity analysis confirms ranking stability. This research contributes a structured AHP-based decision framework integrating project management aspects, supporting developers, industries, and regulators in accelerating data- driven solar adoption.
Item Type: | Thesis (S2) |
---|---|
NIM/NIDN Creators: | 55121120073 |
Uncontrolled Keywords: | PLTS atap, pemilihan lokasi, AHP, manajemen proyek, energi terbarukan, sektor industri. Rooftop solar PV, site selection, AHP, project management, renewable energy, industrial sector. |
Subjects: | 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum |
Divisions: | Pascasarjana > Magister Manajemen |
Depositing User: | Maulana Arif Hidayat |
Date Deposited: | 17 Sep 2025 07:30 |
Last Modified: | 17 Sep 2025 07:30 |
URI: | http://repository.mercubuana.ac.id/id/eprint/98015 |
Actions (login required)
![]() |
View Item |