AMIN, MUCHAMAD NUR (2025) ANALISIS FAKTOR DAN VARIABEL DOMINAN PENYEBAB TERJADI NYA COST OVERRUN GALIAN PILECAP PROYEK LRT JAKARTA PHASE 1B. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 COVER.pdf Download (473kB) | Preview |
|
![]() |
Text (BAB I)
02 BAB 1.pdf Restricted to Registered users only Download (177kB) |
|
![]() |
Text (BAB II)
03 BAB 2.pdf Restricted to Registered users only Download (582kB) |
|
![]() |
Text (BAB III)
04 BAB 3.pdf Restricted to Registered users only Download (492kB) |
|
![]() |
Text (BAB IV)
05 BAB 4.pdf Restricted to Registered users only Download (606kB) |
|
![]() |
Text (BAB V)
06 BAB 5.pdf Restricted to Registered users only Download (205kB) |
|
![]() |
Text (DAFTAR PUSTAKA)
07 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (161kB) |
|
![]() |
Text (LAMPIRAN)
08 LAMPIRAN.pdf Restricted to Registered users only Download (1MB) |
Abstract
The implementation of construction projects often experiences a mismatch between the initial planning and the conditions in the field. This mismatch can be in the form of errors in the implementation of construction projects that can cause problems with the addition of time and increased costs. Costs that cannot be controlled during implementation are likely to cause a risk of cost overrun, in this project the cost overrun is due to changes in the pilecap design. The purpose of this study is to identify what factors and variables cause the cost overrun of changes in the pilecap design of the Jakarta LRT phase 1B project. To find out the percentage (%) of the cost overrun of the pilecap excavation, the research method used in this study is a quantitative approach method, with a research instrument in the form of a questionnaire. In carrying out this research, a research instrument in the form of a questionnaire was used and processed using SPSS. From the results of the study, it can be concluded that the cost overrun in the LRT pilecap excavation project was "5%" of the contract value. The most dominant factors and variables affecting the cost overruns of the LRT project pile cap excavation are planning and communication factors as well as environmental factors, then the most dominant variables are the low evaluation and decision-making system and the lack of geological information, the solution for improvement is by implementing the right evaluation method, regular review and feedback, initial geological studies, consultation with geologists and continuous monitoring.. keywords: Cost Overrun, Construction Costs, SPSS Pelaksanaan proyek konstruksi sering mengalami ketidaksesuaian antara perencanaan awal dengan kondisi di lapangan. Ketidak sesuaian ini dapat berupa kesalahan-kesalahan pada pelaksanaan proyek konstruksi yang dapat menimbulkan masalah pada penambahan waktu dan peningkatan biaya. Biaya yang tidak bisa dikendalikan pada saat pelaksanaan kemungkinan akan menimbulkan risiko pembengkakan biaya (cost overrun), pada proyek ini pembengkakan biaya di karenakan perubahan design pilecap. Tujuan penelitian ini untuk mengidentifikasi faktor dan variabel apa saja yang menyebabkan terjadinya pembengkakan biaya perubahan design pilecap proyek LRT Jakarta fase 1B. Untuk mengetahui berapa prosentase (%) pembengkakan biaya galian pilecap,Metode penelitian yang digunakan dalam penelitian ini adalah metode pendekatan kuantitatif, dengan instrumen penelitian berupa kuesioner. Dalam pengerjaan penelitian ini digunakan instrumen penelitian berupa kuesioner dan diolah menggunakan SPSS. Dari hasil penelitian dapat simpulkan bahwa pembengkakan biaya pada proyek galian pilecap LRT sebesar ”5%” dari nilai kontrak. Faktor dan variabel paling dominan terhadap pembengkakan biaya galian pilecap proyek LRT adalah faktor perencanaan dan komunikasi serta faktor lingkungan, lalu untuk variabel paling dominan adalah rendah sistem evaluasi dan pengambilan kepututusan dan kurangnya informasi geologi, solusi perbaikan dengan cara Implementasi Metode Evaluasi yang Tepat, Review dan Feedback Teratur,studi geologi awal, konsultasi dengan ahli geologi dan pemantauan berkelanjutan kata kunci: Cost Overrun, Biaya Kontruksi, SPSS