GUMELAR, ERIK AGUNG (2024) ANALISIS PERHITUNGAN PENINGKATAN BIAYA AKIBAT PERUBAHAN DESAIN PONDASI BERBASIS IMPLEMENTASI BUILDING INFORMATION MODELING (BIM-5D) PADA BANGUNAN BERTINGKAT TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. COVER.pdf Download (362kB) | Preview |
|
|
Text (ABSTRAK)
02. ABSTRAK.pdf Download (204kB) | Preview |
|
![]() |
Text (BAB I)
03. BAB 1.pdf Restricted to Registered users only Download (378kB) |
|
![]() |
Text (BAB II)
04. BAB 2.pdf Restricted to Registered users only Download (344kB) |
|
![]() |
Text (BAB III)
05. BAB 3.pdf Restricted to Registered users only Download (303kB) |
|
![]() |
Text (BAB IV)
06. BAB 4.pdf Restricted to Registered users only Download (5MB) |
|
![]() |
Text (BAB V)
07. BAB 5.pdf Restricted to Registered users only Download (222kB) |
|
![]() |
Text (DAFTAR PUSTAKA)
08. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (175kB) |
|
![]() |
Text (LAMPIRAN)
09. LAMPIRAN.pdf Restricted to Registered users only Download (4MB) |
Abstract
In this project, there was a pruning of the Office Tower building which resulted in a reduction in the capacity of this development project, so that there was an increase in the Emerald building which is right next to the Office Tower building, with this increase resulting in an increase in structural load so that the foundation that originally used the Pile Cap foundation had to be replaced with a Raft Foundation. The purpose of this study is to find out how much the cost changes due to changes in the foundation of high-rise building projects. The objects calculated were the volume of iron, formwork and concrete of the Raft Foundation using Building Information Modeling (BIM-5D) Cubicost TAS and TRB. The results of this research were obtained an increase in the volume of iron which was initially 89,291.27 Kg to 253.104,502 Kg. The volume of concrete which was initially 513.34
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 24 115 |
NIM/NIDN Creators: | 41120010109 |
Uncontrolled Keywords: | Building Information Modeling, Peningkatan Biaya, Raft Foundation |
Subjects: | 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 020 Library and Information Sciences/Perpustakaan dan Ilmu Informasi > 022 Administration of The Physical Plant/Administrasi dan Fisik Perpustakaan > 022.3 Buildings/Bangunan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | ANANDA NADIRA PUTRI |
Date Deposited: | 18 Sep 2024 04:45 |
Last Modified: | 18 Sep 2024 04:45 |
URI: | http://repository.mercubuana.ac.id/id/eprint/91509 |
Actions (login required)
![]() |
View Item |