PENGHEMATAN AREA STASIUN KERJA PADA PROSES PRODUKSI PANEL FRONT DVD PLAYER MODEL X DENGAN METODE FINISHING IN MACHINE (FIM) PT. DAE IN TECH INDONESIA

IRIANTO, FEBRIAN (2013) PENGHEMATAN AREA STASIUN KERJA PADA PROSES PRODUKSI PANEL FRONT DVD PLAYER MODEL X DENGAN METODE FINISHING IN MACHINE (FIM) PT. DAE IN TECH INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1.Halaman Cover.pdf

Download (629kB) | Preview
[img]
Preview
Text (ABSTRAK)
2.ABSTRAKSI.pdf

Download (53kB) | Preview
[img] Text (BAB I)
3.BAB I.pdf
Restricted to Registered users only

Download (82kB)
[img] Text (BAB II)
4.BAB II.pdf
Restricted to Registered users only

Download (423kB)
[img] Text (BAB III)
5.BAB III.pdf
Restricted to Registered users only

Download (137kB)
[img] Text (BAB IV)
6.BAB IV.pdf
Restricted to Registered users only

Download (410kB)
[img] Text (BAB V)
7.BAB V.pdf
Restricted to Registered users only

Download (68kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8.Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (1MB)
Item Type: Thesis (S1)
NIM/NIDN Creators: 41607110030
Subjects: 600 Technology/Teknologi > 680 Manufacture For Specific Uses/Industri Pembuatan produk untuk penggunaan tertentu > 688 Detail finishing/Teknik Penyelesaian
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 725 Public Structures Architecture/Arsitektur Struktur Umum > 725.3 Transportation and Storage Buildings/Arsitektur Gedung Sarana Pengangkutan dan Penyimpanan > 725.31 Railroad and Rapid Stations/Jalan Kereta api dan Stasiun
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Dede Muksin Lubis
Date Deposited: 04 Sep 2024 07:59
Last Modified: 04 Sep 2024 07:59
URI: http://repository.mercubuana.ac.id/id/eprint/91182

Actions (login required)

View Item View Item