PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK SPRINGWOOD RESIDENCE SERPONG, TANGERANG

KURNIAWAN, RIKO (2017) PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK SPRINGWOOD RESIDENCE SERPONG, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
HAL COVER.pdf

Download (666kB) | Preview
[img] Text (BAB I)
BAB 1.pdf
Restricted to Registered users only

Download (364kB)
[img] Text (BAB II)
BAB 2.pdf
Restricted to Registered users only

Download (759kB)
[img] Text (BAB III)
BAB 3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB IV)
BAB 4.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB V)
BAB 5.pdf
Restricted to Registered users only

Download (319kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (20MB)

Abstract

PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK SPRINGWOOD RESIDENCE SERPONG, TANGERANG

Item Type: Thesis (S1)
Call Number CD: KP/ARS. 17 047
NIM/NIDN Creators: 41213010016
Uncontrolled Keywords: FINISHING, ARSITEKTUR, PROYEK SPRINGWOOD RESIDENCE SERPONG
Subjects: 200 Religion/Agama > 240 Christian Moral and Devotional Theology/Moral Kristen dan Teologi Kebaktian > 246 Use of Art in Christianity/Seni dalam Agama Kristen > 246.9 Architecture/Arsitektur
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 721 Architectural Structure/Struktur Arsitektur
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 728 Residential and Related Buildings/Perumahan
Divisions: Fakultas Teknik > Arsitektur
Depositing User: NAJLA
Date Deposited: 24 Jun 2024 04:26
Last Modified: 24 Jun 2024 04:26
URI: http://repository.mercubuana.ac.id/id/eprint/89130

Actions (login required)

View Item View Item