PERBAIKAN SISTEM PENGENDALIAN SPARE PART DENGAN METODE RELIABILITY CENTERED SPARE (RCS) DAN ECONOMIC ORDER QUANTITY (EOQ) PADA INDUSTRI JASA PENERBANGAN NASIONAL

ALAM, FACHRUL (2024) PERBAIKAN SISTEM PENGENDALIAN SPARE PART DENGAN METODE RELIABILITY CENTERED SPARE (RCS) DAN ECONOMIC ORDER QUANTITY (EOQ) PADA INDUSTRI JASA PENERBANGAN NASIONAL. S2 thesis, Universitas Mercu Buana - Menteng.

[img]
Preview
Text (Cover)
55322110024-FachrulAlam-01 Cover - Fachrul Alam.pdf

Download (1MB) | Preview
[img] Text (Abstrak)
55322110024-Fachrul Alam-02 Abstrak - Fachrul Alam.pdf

Download (339kB)
[img] Text (Bab 1)
55322110024-Fachrul Alam-03 Bab 1 - Fachrul Alam.pdf
Restricted to Registered users only

Download (499kB)
[img] Text (Bab 2)
55322110024-Fachrul Alam-04 Bab 2 - Fachrul Alam.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 3)
55322110024-Fachrul Alam-05 Bab 3 - Fachrul Alam.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 4)
55322110024-Fachrul Alam-06 Bab 4 - Fachrul Alam.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 5)
55322110024-Fachrul Alam-07 Bab 5 - Fachrul Alam.pdf
Restricted to Registered users only

Download (472kB)
[img] Text (Daftar pustaka)
55322110024-Fachrul Alam-09 Daftar Pustaka - Fachrul Alam.pdf
Restricted to Registered users only

Download (344kB)
[img] Text (Lampiran)
55322110024-Fachrul Alam-10 Lampiran - Fachrul Alam.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Formulir keabsahan dan publikasi TA)
SuratPernyataanKeasliandanPersetujuanUnggahdanPublikasi-FA - Fachrul Alam.pdf
Restricted to Repository staff only

Download (518kB)

Abstract

Airplanes stand as one of the safest and most efficient modes of transportation globally. However, even these engineering marvels are subject to the rigorous demands of maintenance and spare parts management. This research delves into enhancing the spare part inventory control system designed explicitly for unscheduled maintenance work within the aviation industry. The primary objective of this study is to comprehensively examine and analyze the existing spare part inventory control system, aiming to identify areas for improvement. The research also proposes a refined spare part inventory control system model. To achieve these goals, the study employs two critical methodologies: economic order quantity (EOQ) for determining optimal stock levels and the Reliability-centered Spare (RCS) method for assessing the fatigue levels of these critical spare parts. The findings of this research demonstrate a significant advancement in the management of spare parts inventory that were previously unavailable. Through the meticulous application of EOQ and RCS, the study has facilitated the establishment of an efficient inventory control system. This system ensures the availability of spare parts and strategically manages stock levels, optimizing the balance between costeffectiveness and reliability. Ultimately, this research contributes to the ongoing efforts to enhance the safety and efficiency of aircraft operations by improving spare part inventory control systems for unscheduled maintenance Pesawat terbang merupakan salah satu moda transportasi yang paling aman dan efisien di dunia. Dalam hal ini pesawat terbang tidak terhindar dari proses maintenance dan inventory spare part. Penelitian ini akan menjelaskan terkait perbaikan sistem pengendalian persediaan spare part untuk pekerjaan unschedule maintenance. Tujuan dari penelitian ini adalah untuk mengetahui dan menganalisis sistem pengendalian persediaan spare part saat ini dan menentukan model sistem pengendalian persediaan spare part. Metode yang digunakan dalam penelitian ini adalah EOQ (Economic Order Quantity) untuk penetuan stock part dan metode RCS (Reliability Centered Spare) untuk penentuan tingkat kekeritisan pada spare part tersebut. Hasil penelitian tersebut dapat diketahui bahwa sistem pengendalian persediaan spare part yang sebelumnya belum tersedia , telah tersedia dengan penentuan EOQ dan RCS.

Item Type: Thesis (S2)
NIM/NIDN Creators: 55322110024
Uncontrolled Keywords: Maintenance, Unschedule, EOQ and RCS Perawatan, Unschedule, EOQ dan RCS
Subjects: 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik
Divisions: Pascasarjana > Magister Teknik Industri
Depositing User: WIDYA AYU PUSPITA NINGRUM
Date Deposited: 21 Feb 2024 04:29
Last Modified: 21 Feb 2024 04:29
URI: http://repository.mercubuana.ac.id/id/eprint/86336

Actions (login required)

View Item View Item