LANNYATI, NINIEK (2022) ONE SIDED CONTRACT DAN PENGARUHNYA TERHADAP KINERJA BIAYA KONTRAKTOR SPESIALIS PADA PROYEK BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
COVER - Niniek Lannyati.pdf Download (1MB) | Preview |
|
|
Text (ABSTRAK)
abstract - Niniek Lannyati.pdf Download (762kB) | Preview |
|
Text (BAB I)
BAB 1 - Niniek Lannyati.pdf Restricted to Registered users only Download (260kB) |
||
Text (BAB II)
BAB 2 - Niniek Lannyati.pdf Restricted to Registered users only Download (538kB) |
||
Text (BAB III)
BAB 3 - Niniek Lannyati.pdf Restricted to Registered users only Download (358kB) |
||
Text (BAB IV)
BAB 4 - Niniek Lannyati.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
BAB 5 - Niniek Lannyati.pdf Restricted to Registered users only Download (65kB) |
||
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA - Niniek Lannyati.pdf Restricted to Registered users only Download (237kB) |
Abstract
ONE SIDED CONTRACT DAN PENGARUHNYA TERHADAP KINERJA BIAYA KONTRAKTOR SPESIALIS PADA PROYEK BANGUNAN GEDUNG
Item Type: | Thesis (S2) |
---|---|
NIM/NIDN Creators: | 9990171858 |
Uncontrolled Keywords: | ONE SIDED CONTRACT DAN PENGARUHNYA TERHADAP KINERJA BIAYA KONTRAKTOR SPESIALIS PADA PROYEK BANGUNAN GEDUNG |
Subjects: | 300 Social Science/Ilmu-ilmu Sosial > 330 Economics/Ilmu Ekonomi > 332 Financial Economics, Finance/Ekonomi Keuangan dan Finansial, Ekonomi Biaya dan Pembiayaan 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan |
Divisions: | Pascasarjana > Magister Teknik Sipil |
Depositing User: | khalimah |
Date Deposited: | 04 Jan 2024 06:40 |
Last Modified: | 11 Jan 2024 08:15 |
URI: | http://repository.mercubuana.ac.id/id/eprint/85148 |
Actions (login required)
View Item |