SITANGGANG, MARISA DOSMA (2022) ANALISIS PERBANDINGAN MAN POWER, PRODUKTIVITAS, DAN OUTPUT PADA SHORT CONVEYOR DAN LONG CONVEYOR DENGAN MENGGUNAKAN METODE MICRO MOTION (STUDI KASUS: PT. EDS MANUFACTURING INDONESIA). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 COVER.pdf Download (385kB) | Preview |
|
|
Text (ABSTRAK)
02 ABSTRAK.pdf Download (50kB) | Preview |
|
Text (BAB I)
03 BAB I.pdf Restricted to Registered users only Download (203kB) |
||
Text (BAB II)
04 BAB II.pdf Restricted to Registered users only Download (273kB) |
||
Text (BAB III)
05 BAB III.pdf Restricted to Registered users only Download (88kB) |
||
Text (BAB IV)
06 BAB IV.pdf Restricted to Registered users only Download (599kB) |
||
Text (BAB V)
07 BAB V.pdf Restricted to Registered users only Download (52kB) |
||
Text (DAFTAR PUSTAKA)
08 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (46kB) |
||
Text (LAMPIRAN)
09 LAMPIRAN.pdf Restricted to Registered users only Download (1MB) |
Abstract
The thesis is compiled to analyze the ratio of man power, productivity and output between short and long conveyor conveyor. In addition to analyzing the conveyor which is better to be applied in PT. EDS Manufacturing Indonesia by using micro motions. The analysis used by researchers working maps, motion studies and calculation of standard time obtained from the data retrieval researchers with methods of micro motion (use a stop watch).The sample in this study is that there are in the final process assy namely setting. From the results, it can be calculated that for man power has the addition of 58% from 7 to 12, to the output increase from be 51.17 units and poduktivitas takttime increased 9% from 4 units to 4.41 units and 20% productivity standard time of 3.35 units to 4.2 units. Keywords: man power, productivity, output, micro-motion Tesis ini disusun untuk menganalisa perbandingan man power, produktivitas dan output antara short conveyor dan long conveyor. Selain itu untuk menganalisa conveyormanakahyang lebih baik untuk diterapkan di PT. EDS Manufacturing Indonesia dengan menggunakan metode micro motions. Analisa yang digunakan peneliti berdasarkan peta kerja, studi gerak dan perhitungan waktu baku yang didapat dari data pengambilan peneliti dengan metode micro motion (penggunaan stop watch). Sampel dalam penelitian ini adalahproses yang ada di final assy yaitu setting.Dari hasil penelitian, dapat dihitung bahwa untuk man power mengalami penambahan 58 % dari 7 orang menjadi 12 orang, untuk output mengalami kenaikan dari 23.49 unit menjadi 51.17 unit dan poduktivitas takttime mengalami kenaikan 9% dari 4 unit menjadi 4.41 unit dan produktivitas waktu baku20% dari 3.35 unit menjadi 4.2 unit. Kata kunci:man power, produktivitas, output, micro motion
Actions (login required)
View Item |