Analisis Perbaikan Penjadwalan Proyek Konstruksi Satu Unit Cluster Aristoteles Dua Lantai Dengan Critical Path Methode (CPM) Pada Proyek CV. Putri Tunggal

Kasroniyanto, Muhamad (2015) Analisis Perbaikan Penjadwalan Proyek Konstruksi Satu Unit Cluster Aristoteles Dua Lantai Dengan Critical Path Methode (CPM) Pada Proyek CV. Putri Tunggal. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
Hal Cover.pdf

Download (745kB) | Preview
[img]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (123kB) | Preview
[img] Text (BAB I)
BAB I PENDAHULUAN.pdf
Restricted to Registered users only

Download (238kB)
[img] Text (BAB II)
BAB II TINJAUAN PUSTAKA.pdf
Restricted to Registered users only

Download (321kB)
[img] Text (BAB III)
BAB III METODOLOGI PENELITIAN.pdf
Restricted to Registered users only

Download (126kB)
[img] Text (BAB IV)
BAB IV PENGUMPULAN DAN PENGOLAHAN DATA.pdf
Restricted to Registered users only

Download (588kB)
[img] Text (BAB V)
BAB V ANALISA.pdf
Restricted to Registered users only

Download (178kB)
[img] Text (BAB VI)
BAB VI KESIMPULAN DAN SARAN.pdf
Restricted to Registered users only

Download (117kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (101kB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 15 026
NIM/NIDN Creators: 41610010009
Uncontrolled Keywords: Critical Path Methode (CPM), Manajemen Proyek, Network Diagram, Float, Crash Program, Cost slope.
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 01 Mar 2015 14:24
Last Modified: 04 Jul 2022 04:32
URI: http://repository.mercubuana.ac.id/id/eprint/7012

Actions (login required)

View Item View Item