NARWANTO, DWI (2015) SUB-STRUKTUR PEMBANGUNAN GEDUNG PERKANTORAN MENARA PARKSON BINTARO-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana.
|
Text (COVER)
1. Hal Cover.pdf Download (287kB) | Preview |
|
Text (ABSTRAK)
2. Abstrak.pdf Restricted to Registered users only Download (33kB) |
||
Text (BAB I)
3. BAB 1.pdf Restricted to Registered users only Download (44kB) |
||
Text (BAB II)
4. BAB 2.pdf Restricted to Registered users only Download (205kB) |
||
Text (BAB III)
5. BAB 3.pdf Restricted to Registered users only Download (79kB) |
||
Text (BAB IV)
6. BAB 4.pdf Restricted to Registered users only Download (545kB) |
||
Text (BAB V)
7. BAB 5.pdf Restricted to Registered users only Download (477kB) |
||
Text (BAB VI)
8. BAB 6.pdf Restricted to Registered users only Download (151kB) |
||
Text (BAB VII)
9. BAB 7.pdf Restricted to Registered users only Download (305kB) |
||
Text (BAB VIII)
10. BAB 8.pdf Restricted to Registered users only Download (40kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
11. Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (888kB) |
Abstract
Pelaksanaan Kerja Praktik Proyek Pembangunan Gedung Perkantoran Menara Parkson, Bintaro-Tangerang selatan, Mengarah kepada pekerjaan Sub-Struktur diantaranya: Pekerjaan setting out plan. Pekerjaan sheet pile & caping beam. Pekerjaan pondasi tower crane Pekerjaan Dewatering. Selain itu Manejement proyek sebagai suatu proses pengendalian proyek harus memiliki suatu system kerja yang baik, system kerja yang baik sangat menentukan keberhasilan suatu proyek, Dan hal lain yang menentukan keberhasilan suatu proyek yaitu proses pengadaan alat kerja dan material. Kata kunci : pekerjaan setting out plan, sheet pile & caping beam.
Actions (login required)
View Item |