PRASTINO, RIZKI RAHMAN (2018) USULAN PERBAIKAN PROSES PRODUKSI UNTUK MEMINIMALKAN WASTE DENGAN PENDEKATAN METODE VALUE STREAM MAPPING PADA PT.IND. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
COVER.pdf Download (75kB) | Preview |
|
|
Text
ABSTRAK Bahasa Indonesia & Inggris.pdf Download (52kB) | Preview |
|
|
Text
Lembar Pengesahan.pdf Download (87kB) | Preview |
|
|
Text
Lembar Peryataan.pdf Download (100kB) | Preview |
|
|
Text
Kata Pengantar.pdf Download (65kB) | Preview |
|
|
Text
Daftar Isi.pdf Download (54kB) | Preview |
|
|
Text
Daftar Tabel.pdf Download (49kB) | Preview |
|
|
Text
Daftar Gambar.pdf Download (48kB) | Preview |
|
|
Text
Daftar Rumus.pdf Download (48kB) | Preview |
|
Text
BAB I.pdf Restricted to Registered users only Download (60kB) |
||
Text
BAB II.pdf Restricted to Registered users only Download (324kB) |
||
Text
Bab III.pdf Restricted to Registered users only Download (125kB) |
||
Text
BAB IV.pdf Restricted to Registered users only Download (297kB) |
||
Text
BAB V.pdf Restricted to Registered users only Download (119kB) |
||
Text
BAB VI.pdf Restricted to Registered users only Download (79kB) |
Abstract
ABSTRAK PT.IND merupakan perusahaan manufaktur yang memproduksi mi instan. Dalam memproduksi mi instan terdapat pemborosan yang teridentifikasi menggunakan value stream mapping dengan alat : PAM, Current Stream Mapping. Pemborosan tersebut adalah pemborosan aktifitas Non Value Added.Metode penelitian yang digunakan pertama-tama menggunakan current stream mapping yang menggambarkan aliran material dan aliran informasi bertujuan melihat proses aktifitas yang value added dan non value added. Dan dilakukan perbandingan aktifitas sebelum perbaikan dan sesudah perbaikan aktifitas Berdasarkan Current Stream Mappingyang telah dibuat, teridentifikasi pemborosan pada kondisi aktual diberi simbol kaizen pada stasiun kerja sebagai tanda yang akan dilakukan perbaikan.Selanjutnya dilakukan pembuatan Future Stream Mapping bertujuan untuk mengurangi Non Value Added aktifitas.Area yang diteliti terbagi kedalam 8 stasiun kerja. Curren Stream Mapping Value Added 1.940 detik dan Non Value Added 13.620 detik Setelah dilakukan perbaikan dengan menggunakan Future Stream MappingValue Added sebesar 5.085 detik dan Non Value Added sebesar 3.600 detik dan 32 total aktifitas. Kata Kunci : VSM,Lean Manufacturing,Process Activity Mapping,Waste,Future Stream Mapping. ABSTRACT PT. IND is a manufacturing company that produces instant noodles. In producing instant noodles contained waste identified using value stream mapping tool: PAM, Current Stream Mapping. Such extravagance is wasteful activities that provide no value to the product. The research method used first of all using the current stream mapping that describes the flow of material and information flow process activities which aim to value added and non-value added. And do a comparison of activities before and after the repair repair activities based on Current Stream Mapping has been made, the actual conditions of waste identified are given the symbol kaizen at work stations as a sign that will carried out repairs. Furthermore carried out making Future Stream Mapping aims to reduce Non Value Added activity. The areas examined are divided into 8 work stations. Curren Stream Mapping Value Added 1,940 seconds and Non Value Added 13,620 seconds after the repair is done by using Future Stream Mapping Value Added of 5,085 seconds and Non Value Added amounted to 3,600 seconds and 32 total activities. Keywords: VSM, Lean Manufacturing, Process Activity Mapping, Waste, Future Stream Mapping.
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 18 019 |
NIM/NIDN Creators: | 41614210013 |
Uncontrolled Keywords: | Kata Kunci : VSM,Lean Manufacturing,Process Activity Mapping,Waste,Future Stream Mapping. |
Subjects: | 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 10 Aug 2022 03:17 |
Last Modified: | 10 Aug 2022 03:17 |
URI: | http://repository.mercubuana.ac.id/id/eprint/67176 |
Actions (login required)
View Item |