SUKMANA, MUHAMMAD FADHIIL DWI (2020) ANALISIS PERBANDINGAN PELAT LANTAI METODE KONVENSIONAL DENGAN METODE HALF SLAB TERHADAP BIAYA DAN WAKTU PROYEK XYZ. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Halaman Judul.pdf Download (35kB) | Preview |
|
|
Text
2. Lembar Pengesahan.pdf Download (602kB) | Preview |
|
|
Text
3. Surat Pernyataan.pdf Download (617kB) | Preview |
|
|
Text
4. Abstrak.pdf Download (26kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (69kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (111kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (22kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (22kB) | Preview |
|
|
Text
9. Daftar Lampiran.pdf Download (22kB) | Preview |
|
Text
10. BAB 1.pdf Restricted to Registered users only Download (113kB) |
||
Text
11. BAB 2.pdf Restricted to Registered users only Download (502kB) |
||
Text
12. BAB 3.pdf Restricted to Registered users only Download (198kB) |
||
Text
13. BAB 4.pdf Restricted to Registered users only Download (647kB) |
||
Text
14. BAB 5.pdf Restricted to Registered users only Download (218kB) |
||
Text
15. Daftar Pustaka.pdf Restricted to Registered users only Download (74kB) |
||
Text
16. Lampiran.pdf Restricted to Registered users only Download (393kB) |
Abstract
Analisis Perbandingan Pelat Lantai Metode Konvensional Dengan Metode Half Slab Terhadap Biaya Dan Waktu, Muhammad Fadhiil Dwi Sukmana, 41116210018, Novika Candra Fertilia, ST, MT., 2020. Pembangunan dalam bidang infrastruktur dan konstruksi di Indonesia dari tahun ke tahun semakin berkembang baik dari segi desain maupun sistem yang digunakan. Beberapa sistem tersebut antara lain sistem konvensional dan precast (Half Slab). Pelaksanaan Sistem konvensional adalah pengecoran di lokasi atau bisa disebut Cast in situ sedangkan precast pelaksanaannya proses produksi dilakukan di tempat khusus, kemudian dibawa ke lokasi proyek (transportasi) untuk disusun menjadi satu kesatuan struktur yang utuh. Di dalam pelaksanaan sistem konvensional terdapat beberapa kekurangan yaitu membutuhkan waktu yang lama, kualitas yang kurang baik serta membutuhkan banyak bekisting dan pekerja, sehingga mengakibatkan waktu pelaksanaan yang lama. Tetapi di balik banyaknya kekurangan tersebut tentu saja ada kelebihannya yaitu biaya pelaksanaan yang murah. Dalam penelitian ini penulis akan melakukan perbandingan sistem pelat lantai konvensional dengan pelat lantai half slab pada proyek jembatan dijadikan objek tugas akhir ini untuk membandingkan pengaruh antara sistem konvensional dengan half slab terhadap kebutuhan biaya pelaksanaan proyek dan jangka waktu pelaksanaan serta metode pelaksanaannya. Adapun analisis perbandingan pelat lantai metode konvensional dan pelat lantai metode half slab telah mendapatkan hasil. Untuk pelat lantai metode konvensional membutuhkan biaya sebesar Rp. 2.353.749.140 dengan waktu pelaksanaan selama 67 hari. Sedangkan pelat lantai half slab membutuhkan biaya sebesar Rp. 2.598.711.750 dengan waktu pelaksanaan selama 49 hari. Jadi pekerjaan pelat lantai konvensional lebih murah Rp. 244.962.610 dibandingkan dengan metode half slab akan tetapi pekerjaan pelat lantai metode half slab lebih cepat 18 hari dibandingkan metode konvensional. Kata Kunci : Pelat Lantai, Half Slab, Konvensional, Biaya, Waktu. http://digilib.mercubuana.ac.id/ v ABSTRACT Comparison Analysis of Conventional Floor Plate with the Half Slab Method Against Cost and Time, Muhammad Fadhiil Dwi Sukmana, 41116210018, Novika Candra Fertilia, ST, MT., 2020. Development in the field of infrastructure and construction in Indonesia from year to year is growing both in terms of design and the system used. Some of these systems include conventional and precast (Half Slab) systems. Conventional System Implementation is casting on site or can be called Cast in situ while precast the implementation of the production process is carried out in a special place, then brought to the project location (transportation) to be arranged into a unified whole structure. In the implementation of conventional system there are some shortcomings that require a long time, poor quality and require a lot of formwork and workers, resulting in a long implementation time. But behind the many shortcomings, of course there are advantages, namely the low cost of implementation. In this study, the writer will compare the conventional floor slab system with the half slab floor slab system on the bridge project as the object of this final project to compare the effect of the conventional slab system with the half slab system on the cost requirements of the project implementation and the implementation period and method of its implementation. The comparative analysis of the conventional floor slab and the half slab floor slab has obtained results. For conventional floor slab the cost is Rp. 2,353,749,140 with 67 days of implementation time. While a half slab floor plate costs Rp. 2,598,711,750 with 49 days of implementation time. So the work of conventional floor plate is cheaper Rp. 244,962,610 compared to the half slab method, but the work of the floor slab method is 18 days faster than the conventional method. Keywords: Floor Plate, Half Slab, Conventional, Cost, Time.
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41116210018 |
Uncontrolled Keywords: | Keywords: Floor Plate, Half Slab, Conventional, Cost, Time. |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | siti maisyaroh |
Date Deposited: | 09 Aug 2022 05:10 |
Last Modified: | 09 Aug 2022 05:10 |
URI: | http://repository.mercubuana.ac.id/id/eprint/67077 |
Actions (login required)
View Item |