SAMUDRA, GATOT (2019) ANALISIS STABILITAS LUBANG BOR PADA PEKERJAAN BOREDPILE ( Studi Kasus : Proyek Pembangunan Jalan Tol Jakarta Cikampek II – Elevated ). S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Cover.pdf Download (104kB) | Preview |
|
|
Text
2. Lembar Pengesahan.pdf Download (1MB) | Preview |
|
|
Text
3. Surat Pernyataan.pdf Download (488kB) | Preview |
|
|
Text
4. Abstrak (Indonesia).pdf Download (83kB) | Preview |
|
|
Text
5. Abstrak (Inggris).pdf Download (83kB) | Preview |
|
|
Text
6. Katapengantar (print).pdf Download (84kB) | Preview |
|
|
Text
7. Daftar Isi (Print).pdf Download (88kB) | Preview |
|
|
Text
8. Daftar Gambar (Print).pdf Download (84kB) | Preview |
|
|
Text
9. Daftar Tabel (Print).pdf Download (81kB) | Preview |
|
|
Text
10. Daftar Lampiran.pdf Download (80kB) | Preview |
|
Text
11. Bab I Pendahuluan.pdf Restricted to Registered users only Download (202kB) |
||
Text
12. Bab II Tinajuan Pustaka.pdf Restricted to Registered users only Download (744kB) |
||
Text
13. Bab III Metode Penelitian.pdf Restricted to Registered users only Download (135kB) |
||
Text
14. Bab IV Analisis dan Pembahasan.pdf Restricted to Registered users only Download (2MB) |
||
Text
15. Bab V Penutup.pdf Restricted to Registered users only Download (89kB) |
||
Text
16. Daftar Pustaka.pdf Restricted to Registered users only Download (93kB) |
||
Text
17. Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
ABSTRAK Judul : Analisis Stabilitas Lubang Bor Pada Pekerjaan Boredpile (Studi Kasus : Proyek Pembangunan Jalan Tol Jakarta Cikampek II – Elevated), Nama : Gatot Samudra, NIM : 41117310047, Dosen Pembimbing : Resi Aseanto, ST., MT., 2018. Perhatian terbesar selama proses konstruksi boredpile adalah menjaga stabilitas dinding galian dan mencegah keruntuhan atau longsoran material kedalam lubang galian tersebut selama proses pengeboran, proses pembesian ataupun proses pengecoran. Penggunaan produk Polimer sebagi lumpur pengeboran, berdasarkan pada rasio konsentrasi polimer terhadap volume air. Dalam praktiknya penentuan konsentrasi polimer ini masih berdasarkan pengalaman bukan dari perhitungan analisis, sehingga dalam beberapa lokasi pengeboran boredpile masih terdapat kasus keruntuhan dinding galian lubang bor. Penelitian ini berdasarkan kepada studi literatur dengan menggunakan data sampel berupa borelog N-SPT pada tiga lokasi. Hasil analisis menunjukkan untuk menjaga stabilitas lubang bor digunakan starter casing sepanjang 6m dan slurry polimer dengan density 10,1 kN/m3 serta menjaga slurry tetap di level permukaan. Untuk mendapatkan slurry polimer dengan density 10,1 kN/m3 dibutuhkan polimer dengan konsentrasi sebesar 1,12 kg/m3 , dimana dalam pencampuran 24m3 air dibutuhkan 27 kg bubuk polimer untuk pencampurannya menjadi slurry polimer. Kata kunci : Pondas Boredpile, Stabilitas lubang bor, Slurry Polimer ABSTRACT Title : Stability Analysis of Pile Bore Holes on Boredpile Works (Case Study : Toll Road Development Project Jakarta Cikampek II- Elevated), Name : Gatot Samudra, NIM : 41117310047, Supervisor : Resi Aseanto, ST., MT., 2018. The biggest concern during the boredpile construction process is maintaining the stability of the excavation wall and preventing the collapse or avalanche of material into the excavation hole during the drilling process, cleaning process or casting process. Use of Polymer products as drilling mud, based on the ratio of polymer concentration to water volume. In practice the determination of polymer concentration is still based on experience rather than analysis calculations, so that in some boredpile drilling locations there are still cases of borehole excavation wall collapse. This research is based on literature studies using sample data in the form of N-SPT borelog at three locations. The results of the analysis showed that to maintain the stability of the borehole, a 6m starter casing and polymer slurry with a density of 10.1 kN / m3 were used and keeping the slurry at the surface level. To get polymer slurry with a density of 10.1 kN/m3 , a polymer with a concentration of 1.12 kg/m3 is needed, where in mixing 24m 3 of water it takes 27 kg of polymer powder for mixing into polymer slurry.. Keywords : Boredpile, Stability of Pile bore, Slurry Polymer
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP 19 030 |
NIM/NIDN Creators: | 41117310047 |
Uncontrolled Keywords: | Kata kunci : Pondas Boredpile, Stabilitas lubang bor, Slurry Polimer |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | siti maisyaroh |
Date Deposited: | 25 Jul 2022 03:07 |
Last Modified: | 26 Jul 2022 03:07 |
URI: | http://repository.mercubuana.ac.id/id/eprint/66040 |
Actions (login required)
View Item |