NAINGGOLAN, PRISTON (2022) PELAKSANAAN PEKERJAAN BEKISTING KOLOM, SHEARWALL, BALOK & PLAT PADA PROYEK CONTROL BUILDING SCBD JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 COVER.pdf Download (408kB) | Preview |
|
|
Text (ABSTRAK)
02 ABSTRAK.pdf Download (24kB) | Preview |
|
Text (BAB I)
03 BAB 1.pdf Restricted to Registered users only Download (73kB) |
||
Text (BAB II)
04 BAB 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
05 BAB 3.pdf Restricted to Registered users only Download (174kB) |
||
Text (BAB IV)
06 BAB 4.pdf Restricted to Registered users only Download (952kB) |
||
Text (BAB V)
07 BAB 5.pdf Restricted to Registered users only Download (23kB) |
||
Text (DAFTAR PUSTAKA)
08 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (165kB) |
||
Text (LAMPIRAN)
09 LAMPIRAN.pdf Restricted to Registered users only Download (2MB) |
Abstract
Waktu pelaksanaan dan biaya yang dikeluarkan pada setiap proses pembangunan menjadi salah satu hal yang utama yang selalu diperhatikan oleh setiap pemilik proyek maupun penyedia jasa pembangunan proyek. Untuk itu pelaksanaan pekerjaan sesuai metode dan pemilihan material adalah salah satu cara untuk mencapai tujuan dalam dalam hal efisiensi waktu dan efisiensi biaya tersebut. Dalam penelitian ini penulis akan membandingkan biaya dan waktu pelaksanaan pekerjaan bekisting raft foundation dari segi material bekisting yang dipilih oleh kontraktor yaitu menggunakan panel baja dan menggunakan precast. Berdasarkan hasil penelitian yang dilakukan oleh penulis mengenai perbandingan biaya dan waktu terhadap bekisting raft foundation menggunakan panel baja dan menggunakan precast, maka penulis dapat menyimpulkan bahwa biaya pelaksanaan pekerjaan bekisting raft foundation menggunakan panel baja adalah sebesar Rp. 264.925.000 dan biaya pelaksanaan pekerjaan menggunakan bekisting precast adalah sebesar Rp. 383.168.000. Persentase selisih kedua bekisting adalah 31%. Artinya dengan menggunakan bekisting precast lebih mahal sebesar Rp. 118.243.000, tetapi pertimbangan penggunaan bekisting precast oleh kontraktor adalah waktu pelaksanaan lebih cepat dan minimnya pekerjaan ulang dibandingkan penggunaan bekisting panel baja. Berdasarkan hasil analisis waktu pelaksanaan pekerjaan bekisting raft foundation menggunakan panel baja adalah 69 hari dan waktu pelaksanaan bekisting precast adalah 50 hari. Selisih waktu pelaksanaan kedua bekisting adalah 19 hari. Maka dapat disimpulkan bahwa durasi pelaksanaan pekerjaan menggunakan bekisting precast lebih cepat daripada bekisting panel baja. Kata Kunci : Bekisting Panel Baja, Bekisting Precast, Perbandingan Biaya, Perbandingan Waktu. The implementation time and costs incurred in each development process are one of the main things that are always considered by every project owner and project development service provider. For this reason, the implementation of work according to the method and material selection is one way to achieve the goal in terms of time efficiency and cost efficiency. In this study the authors will compare the cost and time of execution of the raft foundation formwork in terms of the formwork material chosen by the contractor, namely using steel panels and using precast. Based on the results of research conducted by the author regarding the cost and time comparison of raft foundation formwork using steel panels and using precast, the authors can conclude that the cost of implementing raft foundation formwork using steel panels is Rp. 264.925.000 and the cost of implementing the work using precast formwork is Rp. 383,168,000. The percentage difference between the two formworks is 31%. This means that using precast formwork is more expensive by Rp. 118,243,000, but the consideration of using precast formwork by contractors is faster execution time and minimal rework compared to the use of steel panel formwork. Based on the results of the analysis, the execution time of the raft foundation formwork using steel panels was 69 days and the precast formwork execution time was 50 days. The time difference between the two formworks is 19 days. So it can be concluded that the duration of the work using precast formwork is faster than steel panel formwork. Keywords: Steel Panel Formwork, Precast Formwork, Cost Comparison, Time Compariso
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 22 025 |
NIM/NIDN Creators: | 41115120021 |
Uncontrolled Keywords: | Steel Panel Formwork, Precast Formwork, Cost Comparison, Time Compariso |
Subjects: | 300 Social Science/Ilmu-ilmu Sosial > 320 Political dan Government Science/Ilmu Politik dan Ilmu Pemerintahan > 323 Civil Rights/Hak-hak Warga Sipil, Hak-hak Warga Negara 300 Social Science/Ilmu-ilmu Sosial > 340 Law/Ilmu Hukum > 347 Civil Procedure and Courts/Prosedur Sipil dan Pengadilan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Dede Muksin Lubis |
Date Deposited: | 11 Jul 2022 03:54 |
Last Modified: | 11 Jul 2022 03:54 |
URI: | http://repository.mercubuana.ac.id/id/eprint/64897 |