SAFRUDIN, DEDEN (2016) METODE PELAKSANAAN TIANG PANCANG PROYEK PUMP STATION KAPUK NAGA INDAH ISLAND 2A PANTAI INDAH KAPUK JAKARTA UTARA. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Cover.pdf Download (641kB) | Preview |
|
|
Text (ABSTRAK)
2. ABSTRAK.pdf Download (19kB) | Preview |
|
Text (BAB I)
3. BAB I.pdf Restricted to Registered users only Download (31kB) |
||
Text (BAB II)
4. BAB II.pdf Restricted to Registered users only Download (593kB) |
||
Text (BAB III)
5. BAB III.pdf Restricted to Registered users only Download (141kB) |
||
Text (BAB IV)
6. BAB IV.pdf Restricted to Registered users only Download (603kB) |
||
Text (BAB V)
7. BAB V.pdf Restricted to Registered users only Download (418kB) |
||
Text (BAB VI)
8. BAB VI.pdf Restricted to Registered users only Download (57kB) |
||
Text (BAB VII)
9. BAB VII.pdf Restricted to Registered users only Download (26kB) |
||
Text (BAB VIII)
10. BAB VIII.pdf Restricted to Registered users only Download (23kB) |
||
|
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
11. Daftar Pustaka dan Lampiran.pdf Download (42MB) | Preview |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | KP/SIP. 16 124 |
NIM/NIDN Creators: | 41111120061 |
Uncontrolled Keywords: | Pembangunan, Rumah Pompa, Penanggulangan Banjir, Manajemen Proyek, Struktur Bawah, Metode Pelaksana |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 29 Jan 2016 12:50 |
Last Modified: | 18 Oct 2024 01:08 |
URI: | http://repository.mercubuana.ac.id/id/eprint/6227 |
Actions (login required)
View Item |