MOYO, ARI (2020) ESTIMASI KEBUTUHAN AIR DAN SUMBER AIR ALTERNATIF PADA GEDUNG PATRA JASA TAHUN 2020 - 2025. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Cover.pdf Download (29kB) | Preview |
|
|
Text
2. Lembar Pengesahan.pdf Download (365kB) | Preview |
|
|
Text
3. Lembar Pernyataan.pdf Download (346kB) | Preview |
|
|
Text
4. Abstrak.pdf Download (273kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (349kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (363kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (353kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (484kB) | Preview |
|
|
Text
9. Daftar Lampiran.pdf Download (243kB) | Preview |
|
Text
10. BAB 1 Pendahuluan.pdf Restricted to Registered users only Download (389kB) |
||
Text
11. BAB 2 Tinjauan Pustaka.pdf Restricted to Registered users only Download (975kB) |
||
Text
12. BAB 3 Metodologi Penelitian.pdf Restricted to Registered users only Download (494kB) |
||
Text
14. BAB 5 Kesimpulan.pdf Restricted to Registered users only Download (305kB) |
||
Text
13. BAB 4 Pembahasan.pdf Restricted to Registered users only Download (1MB) |
||
Text
15. Daftar Pustaka.pdf Restricted to Registered users only Download (325kB) |
||
Text
16. Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
ABSTRAK Estimasi Kebutuhan Air dan Sumber Air Alternatif pada Gedung Patra Jasa Tahun 2020 – 2025, Ari Moyo, 41116210001, Jantiara Eka Nandiasa, S.T,MT., 2019. Perkembangan wialayah di Ibu kota berjalan sangat pesat hal ini akan menyebabkan kebutuhan air akan terus meningkat seiring dengan laju pertumbuhan penduduk, segala pemenuhan kebutuhan pangan dan aktivitas penduduk erat kaitannya dengan kebutuhan air. Penelitian ini bertujuan untuk mengetahui jumlah total kebutuhan air yang diperlukan oleh Gedung Patra Jasa pada tahun 2020- 2025 dan untuk menghemat penggunaan air dan biaya dengan adanya sumber air alternatif lain. Penelitian ini menggunakan metode penelitian pendekatan studi kasus dengan dikumpulkannya data primer dan data sekunder, berikutnya dilakukan analisis ketersediaan dan kebutuhan airnya, lalu digantikan dengan sumber air alternatif. Dari hasil penelitian ini Air bersih konsumtif pertahun 63838,5 m3 , air bersih non – konsumtif per tahun 46681 m3 dengan rincian kebutuhan flushing 36500 m3 , penyiraman 6351 m3 , dan cooling tower 3650 m3 . Potensi dari penelitian sumber – sumber air alternatif sebagaimana pada hal ini adalah sumber air hujan yang dapat digunakan untuk memenuhi kebutuhan harian Gedung sebesar 879,38 m3 / hari sehingga dapat mengcover semua kebutuhan air non konsumtif. Desain Tangki FRP yang dipakai adalah Tangki FRP 1200 m3 dengan metode suplai hujan yang dapat di panen dari atap Gedung Patra Jasa yaitu 320973,7 m3 / tahun dan kebutuhan rata-rata adalah 174,9 m3 / Hari, 5274 m3 / Bulan, 63838.5 m3 / tahun. Penghematan penggunaan air tahunan sebanyak 57835,71 m3 / tahun atau sebesar Rp. 725.880.160,00. Kata Kunci – Hidrologi, Kebutuhan Air, Sumber Air Alternatif. ABSTRACT Estimation of water demand and alternative water resources at Patra Jasa year's Building 2020 – 2025, Ari Moyo, 41116210001, Jantiara Eka Nandiasa, S. T, MT., 2019. The development of Wialayah in the capital is very rapid, this will cause water demand will continue to increase as the rate of population growth, all fulfilment of food needs and activity of the population is closely related to the needs of water. This research aims to determine the total number of water needs required by the Patra Jasa building in the years 2020-2025 and to conserve water use and costs with the presence of alternative water sources. The study uses research methods with a case study approach, where the methods used are descriptive, quantitative and analytical aimed at evaluating the conditions of a certain period as the basis of planning for the future based on collected data. From the research results of this consumerist clean water per 63838.5 m3 , clean water Nonconsumptive year 46681 m3 with details needs flushing 36500 m3 , watering 6351 m3 , and Cooling tower 3650 m3 . Potential of source research-alternative water sources as in this is a source of rain water that can be used to meet the daily needs of building 1510.416 m3 /day so that it can cover all the needs of non consumptive water. FRP tank design used is FRP 1200 m3 tank with a method of rain supply that can be harvested from the roof of Patra Jasa building is 9082.5 m3 /year and the average requirement is 174.9 m3 /day, 5274 m3 /month, 63838.5 m3 /year. Annual water usage savings of 9082.5 m3 /year or Rp. 113,985,375.00. Keywords – hydrology ,water supplies, alternative water sources.
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP 20 004 |
NIM/NIDN Creators: | 41116210001 |
Uncontrolled Keywords: | Kata Kunci – Hidrologi, Kebutuhan Air, Sumber Air Alternatif. |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | siti maisyaroh |
Date Deposited: | 25 May 2022 06:08 |
Last Modified: | 25 May 2022 06:08 |
URI: | http://repository.mercubuana.ac.id/id/eprint/61834 |
Actions (login required)
View Item |