CHOIRUL, (2020) IDENTIFIKASI FAKTOR KETERLAMBATAN DALAM PEKERJAAN BANGUNAN PELIMPAH (SPILLWAY) PADA PROYEK BENDUNGAN CIPANAS KAB.SUMEDANG. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Judul.pdf Download (27kB) | Preview |
|
|
Text
2. Abstrak.pdf Download (92kB) | Preview |
|
|
Text
3. Lembar Pengesahan.pdf Download (207kB) | Preview |
|
|
Text
4. Surat Pernyataan.pdf Download (73kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (84kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (99kB) | Preview |
|
|
Text
7. Daftar Gambar.pdf Download (80kB) | Preview |
|
|
Text
8. Daftar Tabel.pdf Download (83kB) | Preview |
|
Text
9. Bab I.pdf Restricted to Registered users only Download (278kB) |
||
Text
10. Bab II.pdf Restricted to Registered users only Download (763kB) |
||
Text
11. Bab III.pdf Restricted to Registered users only Download (555kB) |
||
Text
12. Bab IV.pdf Restricted to Registered users only Download (717kB) |
||
Text
13. Bab V.pdf Restricted to Registered users only Download (320kB) |
||
Text
14. Daftar Pustaka.pdf Restricted to Registered users only Download (84kB) |
||
Text
15. Lampiran.pdf Restricted to Registered users only Download (157kB) |
Abstract
ABSTRAK Judul : Identifikasi Faktor Keterlambatan Dalam Pekerjaan Bangunan Pelimpah (Spillway) Pada Proyek Bendungan Cipanas kabupaten Sumedang , Nama : Choirul, NIM : 41115310024, Dosen Pembimbing : Anjas Handayani, ST., MT., 2019. Perkembangan teknologi dalam dunia konstruksi telah mengalami peningkatan, khususnya sumber daya air untuk konstruksi Bendungan. Adanya beberapa metode untuk pekerjaan tersebut, memungkinkan untuk memberikan dampak positif berupa efektifitas terhadap waktu pada pelaksanaannya. Dengan efektifitas waktu yang diberikan, maka penggunaan metode tertentu dalam pelaksanaan konstruksi akan memperoleh suatu percepatan pekerjaan. Dalam penelitian ini peneliti menggunakan kuesioner sebagai instrument penelitian. Pada pengumpulan data dilakukan dengan menyebarkan kuesioner kepada Tim Proyek Pembangunan Bendungan Cipanas Paket-2 Kabupaten Sumedang Provinsi Jawa Barat. Data dianalisis menggunakan uji validitas, uji reliabilitas, uji normalitas, uji F dan uji T. Hasil penelitian menunjukan bahwa variabel dominan yang paling berpengaruh terhadap efektifitas waktu pelaksanaan pekerjaan bangunan spillway dengan menggunakan metode konstruksi diantaranya variabel area kerja, waktu, tenaga kerja, peralatan kerja, K3, manajemen, dan owner. Hal itu dikarenakan berpengaruh pada efektifitas dan produktifitas masa pelaksanaan pekerjaan bangunan pelimpah air Spillway . Selain itu ada variabel lain diantaranya desain konstruksi, material, area kerja, tenaga kerja, peralatan kerja, keselamatan kerja, manajemen dan beberapa variabel lainnya. Maka dapat di lihat bahwa variabel kontruksi itu dapat memberikan efektifitas dan produktifitas pelaksanaan pekerjaan. Dilihat dari hasil tersebut variabel yang memiliki pengaruh paling tinggi terhadap waktu pelaksanaan konstruksi adalah faktor produktifitas tenaga kerja. Kata kunci : Spillway.Proyek.Cipanas . ABSTRAK Title : Identification Of Delay Factors in Sumedang District Cipanas Dried Project, Name:Choirul NIM:4115310024, Supervisor : Anjas Handayani, ST., MT., 2019. Technological developments in the world of construction have increased, especially water resources for dam construction. The existence of several methods for the work, it is possible to have a positive impact in the form of effectiveness over time on implementation. With the effectiveness of time given, the use of certain methods in the implementation of construction will obtain an acceleration of work. In this study researchers used a questionnaire as a research instrument. The data was colleted by distrubuting questionnaires to the cipanas package-2 Dam Contruction Project Team in Sumedang Regency, West Java Province. Data Were analyzed using validity test,reability test,normality test,F test and T test. The results showed that the dominant variabel that most influeced the effectivenes of the implementation of spillway building work by using contstruction method included variabel work area,time labor,work equitment,K3,management,and owner. That is because it affects the effectivenes and productivity of the implementation of the spillway water overflow building. In addition there are other variables including construction design,materials,work area,labor,work equipment,work safty,management,and several others variables.Then it can be seen that the contstruction variable can provide effectivennes and productivity in the implementation of work. Judging from these results the variable that has highest influence on the time of contstruction is the factor of labor productivity. Key words : Spillway.Project.Cipanas .
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP 20 004 |
NIM/NIDN Creators: | 41115310024 |
Uncontrolled Keywords: | Kata kunci : Spillway.Proyek.Cipanas . |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | siti maisyaroh |
Date Deposited: | 23 May 2022 07:01 |
Last Modified: | 23 May 2022 07:01 |
URI: | http://repository.mercubuana.ac.id/id/eprint/61568 |