SETIAJI, DIMAS (2019) PENERAPAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM ANALISA EFEKTIVITAS PADA MESIN CCVB DI PT. SUPREME CABLE MANUFACTURING AND COMMERCE Tbk. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1.cover.pdf Download (216kB) | Preview |
|
|
Text (ABSTRAK)
5.abstrak.pdf Download (263kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
2.lembar pernyataan.pdf Download (272kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3.lembar pengesahan.pdf Download (317kB) | Preview |
|
|
Text (KATA PENGANTAR)
4.kata pengantar.pdf Download (262kB) | Preview |
|
|
Text (DAFTAR ISI)
6.daftar isi.pdf Download (306kB) | Preview |
|
|
Text (DAFTAR TABEL)
7.daftar tabel.pdf Download (215kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8.daftar gambar.pdf Download (215kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
9.daftar lampiran.pdf Download (211kB) | Preview |
|
Text (BAB I)
10.BAB I.pdf Restricted to Registered users only Download (281kB) |
||
Text (BAB II)
11.BAB II.pdf Restricted to Registered users only Download (525kB) |
||
Text (BAB III)
12.BAB III.pdf Restricted to Registered users only Download (301kB) |
||
Text (BAB IV)
13.BAB IV.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
14.BAB V.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB VI)
15.BAB VI.pdf Restricted to Registered users only Download (259kB) |
||
Text (DAFTAR PUSTAKA)
16.daftar pustaka.pdf Restricted to Registered users only Download (118kB) |
||
Text (LAMPIRAN)
17.lampiran.pdf Restricted to Registered users only Download (407kB) |
Abstract
The key to the success of every Manufacturing Optimization Strategies is a reliable machine, one of the methods of measuring the success rate of implementing TPM is through measuring the Overall Equipment Effectiveness (OEE) value. PT. SUCACO, Tbk. is a company that operates in the field of cable manufacturing which can not be separated from problems related to the effectiveness of the machine or equipment. One of the causes of the disruption of the production process is the lack of maintenance management on the production machine. One obstacle faced in the company's production process is the high downtime in the PEXCCVIB (CCVB) engine production line, with an average downtime occurring in the January-December 2018 period of 1162.75 minutes / month, far exceeding the planned target downtime that is 120 minutes / month. On average, the achievement of OEE from CCVB machines during the January-December 2018 period was only 73%, with an average availability, performance and quality of 97%, 76% and 99.2%, respectively. This achievement does not meet the ideal conditions for world class OEE equipment, which is 85%. Then it is also known that Reduce Speed Losses are the highest losses from the CCVB engine which causes low effectiveness of engine performance, downtime caused by Machine Breakdown affects engine performance and decreases engine speed in producing output. These results are obtained through the Six Big Losses factor that affects the low effectiveness of the CCVB engine known by Pareto Chart analysis and Fishbone Diagrams with the total Time Loss of Reduce Speed Losses of 99024 minutes from the total Time Loss of 115245 minutes. Keywords: Overall Equipment Effectiveness (OEE), Availability, Performance, Quality, Six Big Losses, Pareto Chart, Reduce Speed Losses, Downtime Kunci kesuksesan dari setiap Manufacturing Optimization Strategies adalah mesin yang andal, salah satu metode mengukur tingkat keberhasilan penerapan TPM adalah melalui pengukuran nilai Overall Equipment Effectiveness (OEE). PT. SUCACO, Tbk. merupakan perusahan yang beroperasi dibidang manufaktur pembuatan kabel yang tidak lepas dari masalah yang berkaitan dengan efektivitas mesin atau peralatan. Salah satu penyebab terganggunya proses prouksi yaitu kurang baiknya manajemen pemeliharaan pada mesin produksi. Salah satu hambatan yang dihadapi pada proses produksi perusahaan adalah tingginya downtime pada lini produksi mesin PEXCCVIB (CCVB), dengan rata-rata downtime yang terjadi pada periode bulan Januari – Desember 2018 sebesar 1162,75 menit/bulan, jauh melebihi target downtime yang direncanakan yaitu sebesar 120 menit/bulan. Secara rata-rata pencapaian OEE dari mesin CCVB selama periode bulan Januari – Desember 2018 hanya sebesar 73%, dengan masing-masing nilai rata-rata Availability, Performance dan Quality sebesar 97%, 76% dan 99,2%. Pencapaian ini tidk memenuhi standar kondisi ideal peralatan OEE kelas dunia yaitu sebesar 85%. Lalu diketahui juga bahawa Reduce Speed Losses merupakan losses tertinggi dari mesin CCVB yang menyebabkan rendahnya efektivitas kinerja mesin, downtime yang disebabkan oleh Machine Breakdown mempengaruhi kinerja mesin dan menyebabkan menurunnya kecepatan mesin dalam menghasilkan output. Hasil ini didapatkan melalui faktor Six Big Losses yang berpengaruh terhadap rendahnya efektivitas mesin CCVB diketahui dengan analisa Pareto Chart dan Fishbone Diagram dengan total Time Loss dari Reduce Speed Losses sebesar 99024 menit dari total Time Loss sebesar 115245 menit. Kata Kunci : Overall Equipment Effectiveness (OEE), Availability, Performance, Quality, Six Big Losses, Pareto Chart, Reduce Speed Losses, Downtime
Actions (login required)
View Item |