ANALISIS PEKERJAAN SHEAR WALL DENGAN METODE PENGECORAN PER LANTAI DAN METODE RAIL CLIMBING SYSTEM DARI SEGI WAKTU

TRIYONO, (2018) ANALISIS PEKERJAAN SHEAR WALL DENGAN METODE PENGECORAN PER LANTAI DAN METODE RAIL CLIMBING SYSTEM DARI SEGI WAKTU. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
1. COVER.pdf

Download (27kB) | Preview
[img]
Preview
Text
3. LEMBAR PERNYATAAN.pdf

Download (269kB) | Preview
[img]
Preview
Text
2. LEMBAR PENGESAHAN.pdf

Download (342kB) | Preview
[img]
Preview
Text
4. ABSTRAK.pdf

Download (198kB) | Preview
[img]
Preview
Text
5. KATA PENGANTAR.pdf

Download (71kB) | Preview
[img]
Preview
Text
6. DAFTAR ISI.pdf

Download (51kB) | Preview
[img]
Preview
Text
7. DAFTAR TABEL.pdf

Download (76kB) | Preview
[img]
Preview
Text
8. DAFTAR GAMBAR.pdf

Download (26kB) | Preview
[img]
Preview
Text
9. DAFTAR LAMPIRAN.pdf

Download (21kB) | Preview
[img] Text
10. BAB I.pdf
Restricted to Registered users only

Download (239kB)
[img] Text
11. BAB II.pdf
Restricted to Registered users only

Download (490kB)
[img] Text
12. BAB III.pdf
Restricted to Registered users only

Download (643kB)
[img] Text
13. BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
14. BAB V.pdf
Restricted to Registered users only

Download (374kB)
[img] Text
15. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (76kB)
[img] Text
16. LAMPIRAN.pdf
Restricted to Registered users only

Download (303kB)
[img] Text
17. JURNAL.pdf
Restricted to Registered users only

Download (321kB)

Abstract

ABSTRAK Judul: Analisis pekerjaan shear wall dengan metode pengecoran per lantai dan metode rail climbing system dari segi waktu. Tugas Akhir, Nama: Triyono, NIM: 41114310017, Dosen Pembimbing: Anjas Handayani, ST, MT., 2018 Dalam dunia konstruksi,durasi waktu pekerjaan menjadi hal yang sangat penting. Oleh karena itu, percepatan pelaksanaan pekerjaan sering dilakukan oleh para kontraktor. Salah satu cara percepatan pelaksanaan pekerjaan adalah dengan menggunakan metode kerja yang lebih efisien. Pada penelitan ini, penulis membandingkan durasi waktu pelaksanaan pekerjaan shearwall dengan metode pengecoran perlantai dan metode rail climbing system. Pada perbandingan durasi, penelitian dilakukan dengan membuat rencana schedule pekerjaan yang mengacu pada schedule realita di lapangan. Sedangkan untuk efisiensi pekerjaan, dilakukan pengumpulan data dari angket kuesioner. Data yang didapat, kemudian dianalisis dengan uji normalitas, uji validitas dan reliabilitas, analisis korelasi dan faktor, serta analisis regresi linear berganda. Tabulasi data dilakukan dengan menyajikan data kedalam bentuk tabel dan diagram untuk mempermudah pengamatan atau evaluasi Hasil dari perbandingan durasi waktu pekerjaan, metode rail climbing system lebih cepat 10 hari apabila dibandingkan dengan metode pengecoran perlantai.Untuk efektivitasnya, pelaksanaan pekerjaan shearwall dengan metode rail climbing system lebih efektif 69,37% apabila dibandingkan dengan metode pengecoran perlantai. Kata kunci : Efektivitas, shear wall, rail climbing system, manajemen konstruksi ABSTRACT Title: Analysis shear wall work with konvensional method and rail climbing system method in terms of time. Final Project, Name: Triyono, NIM: 41114310017, Supervisor: Anjas Handayani, S.T., M.T., 2018 In construction, the duration becomes very important. Therefore, the acceleration of the implementation of work is often carried out by contractors. One way to accelerate the implementation of work is to use a more efficient work method. In this research, the author compares the duration of execution of shear wall konvensional method and rail climbing system method. On the comparison of the duration, the research the planning schedule and schedule reality in the field. As for the efficiency of the work, conducted data collection from the now questionnaire. The data obtained, then analyzed with normality test, test validity and reliability analysis, correlation and factor, as well as multiple linear regression analysis. Data tabulated is done by presenting the data into the form of tables and diagrams to make observations or evaluation The result of the comparison of the duration of time of work, methods of rail climbing system faster 10 days when compared with the konvensial method. For its effectiveness, the implementation of the work of shear wall with method of rail climbing system more effective 69.37% when compared with the konvensional method. Keywords: effectiveness, shear wall, rail climbing system, construction managemen

Item Type: Thesis (S1)
Call Number CD: FT/SIP 18 037
NIM/NIDN Creators: 41114310017
Uncontrolled Keywords: Kata kunci : Efektivitas, shear wall, rail climbing system, manajemen konstruksi
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: siti maisyaroh
Date Deposited: 22 Feb 2022 05:46
Last Modified: 22 Feb 2022 05:46
URI: http://repository.mercubuana.ac.id/id/eprint/56537

Actions (login required)

View Item View Item